|
|
【YTLPOWR 6742 交流专区2】楊忠礼能源
[复制链接]
|
|
|
发表于 22-5-2009 06:58 PM
|
显示全部楼层
5 x 0.0375 x 1000 = 187.5  |
|
|
|
|
|
|
|
|
|
|
发表于 22-5-2009 07:31 PM
|
显示全部楼层
|
|
|
|
|
|
|
|
|
|
发表于 23-5-2009 01:00 AM
|
显示全部楼层
对不起,不是很明白。
为什麼不是 5000lots x 2.10 (Share price) x 0.0375 = 393.75 ? |
|
|
|
|
|
|
|
|
|
|
发表于 23-5-2009 01:12 AM
|
显示全部楼层
回复 1662# robitech9 的帖子
股息-- RM0.0375 per unit
你拥有的股数量 -- 5000unit
所以你将会收到的股息数目 -- 5000unit x RM0.0375 = RM187.50 |
|
|
|
|
|
|
|
|
|
|
发表于 23-5-2009 02:08 AM
|
显示全部楼层
原帖由 robitech9 于 23-5-2009 01:00 AM 发表 
对不起,不是很明白。
为什麼不是 5000lots x 2.10 (Share price) x 0.0375 = 393.75 ?
跟你买什么价钱没有关系
0.0375乘你有多少股就对了
那是你会拿到的股息
你用RM1或RM2买, 一样都是一股RM0.0375
股价是在算DY%的时候用的
0.0375 / RM2.10 x 100 = 1.78%
[ 本帖最后由 纸鹤 于 23-5-2009 02:14 AM 编辑 ] |
|
|
|
|
|
|
|
|
|
|
发表于 23-5-2009 10:07 AM
|
显示全部楼层
(吉隆坡)楊忠禮電力(YTLPOWR,6742,主板基建計劃組)第3季淨利挫20.2%至2億2140萬令吉,分析員預期最壞情況已於第3季觸底,第4季料能漸入佳境,不排除派更高股息可能性。
分析員普遍認為,第4季淨利逐漸回升,主要是併購的新加坡公司西拉雅能源作全季貢獻、英國韋塞克斯水務業因英鎊穩定有助強化第4季淨利。
分析員說,馬幣兌英鎊走疲1%,將使其淨利加強1.2%,不排除派更高股息可能。
達證券預期,2009財政年派12仙股息,較之前預期的11仙高。
聯昌研究則說,儘管第3季淨利下挫,仍派每股3.75仙免稅中期股息,使迄今每股總股息達仙15仙(7.2%回酬),比去年同期的10仙還高。
目前派息已超越全年預期。
今年迄今派息率達71%,超越過去5年的43%至45%。倘若終期股息一如往年,2009年將有9.6%誘人的週息率。
聯昌研究說,新加坡電力從4月至5月中有上揚之勢,而自去年10月的6個月電力需求則下跌,相信在第4季的全季貢獻更為顯著。
“英國韋塞克斯水供(Wessex Water)第3季營業額按年挫12%,主要是英鎊按年貶值15%,此貶值大大抵銷水務銷售價,其賺益跌幅達3%。”
大馬研究說,核心淨利按年挫19%,主要需付獨立發電廠的8000萬暴利稅,加上韋塞克斯水供淨利挫9%,英鎊平均按年貶值15.5%為罪魁禍首。
“韋塞克斯水供貢獻佔首9個月營運盈利的66%,電力佔27%,投資收入佔7%。西拉雅能源加入行列後,2010年的電力貢獻增至30%。”
英新水費明年生效
達證券也說,2010至2015年的英國新水費今年杪敲定,2010年4月開始生效。
M I M B研究說,第4季業績看好,因西拉雅能源將作全季貢獻,英鎊增值亦將是功臣。惟也因匯率波動,下調全年淨利預測13%至8億9290萬令吉。
聯昌研究維持楊忠禮電力2009至2010年淨利與每股股息預測。
大馬研究維持2009至2011財政年預測,2009年預測已把西拉雅能源3個月的貢獻計算在內。
2009年淨利為8億8640萬令吉,2010年預計為11億零60萬令吉。
“喜愛楊忠禮電力在全球進行公用設施的特許經營模式,管理層改善股東價值,致力於探索新併購計劃。”
現金充裕將進行更多併購
聯昌研究說,這間公司手握55億現金,將提供機會進行更多“強化盈利”的併購,全球資產價值低是併購良機。
達證券說,儘管新近才併購新加坡公司西拉雅能源,相信此集團仍有興趣以合理價併購更多資產。
“先進國的資產將是其併購目標,澳洲與英國的資產被併購潛能大。”
星洲日報/財經‧2009.05.22 |
|
|
|
|
|
|
|
|
|
|
发表于 23-5-2009 10:11 AM
|
显示全部楼层
|
|
|
|
|
|
|
|
|
|
发表于 23-5-2009 02:00 PM
|
显示全部楼层
|
|
|
|
|
|
|
|
|
|
发表于 23-5-2009 02:09 PM
|
显示全部楼层
普遍上来说, warrant在到期后一定会全数转为母股吧?
不然就浪费掉了
那如果把现在母股的数量再加上剩余在市场上的WA和WB
在两个WARRANT都到期了后, YTLP会有总数多少的股数?? |
|
|
|
|
|
|
|
|
|
|
发表于 23-5-2009 04:42 PM
|
显示全部楼层
|
|
|
|
|
|
|
|
|
|
发表于 23-5-2009 10:47 PM
|
显示全部楼层
公司需要自己拿出钱来把那些WA转去母股?
那不是很多钱..???
____________________________________
啊, 你说的是YTL-CORP
所以出钱的不是YTLP
而且YTLP会收到每股1.18的钱
然后股数变多, 是酱吗?
[ 本帖最后由 纸鹤 于 24-5-2009 02:01 PM 编辑 ] |
|
|
|
|
|
|
|
|
|
|
发表于 24-5-2009 02:03 PM
|
显示全部楼层
|
|
|
|
|
|
|
|
|
|
发表于 24-5-2009 06:27 PM
|
显示全部楼层
请问这股几时派息 |
|
|
|
|
|
|
|
|
|
|
发表于 24-5-2009 06:30 PM
|
显示全部楼层
|
|
|
|
|
|
|
|
|
|
发表于 24-5-2009 07:53 PM
|
显示全部楼层
|
|
|
|
|
|
|
|
|
|
发表于 24-5-2009 08:22 PM
|
显示全部楼层
|
|
|
|
|
|
|
|
|
|
发表于 25-5-2009 09:32 AM
|
显示全部楼层
|
|
|
|
|
|
|
|
|
|
发表于 25-5-2009 09:33 AM
|
显示全部楼层
|
|
|
|
|
|
|
|
|
|
发表于 25-5-2009 09:51 AM
|
显示全部楼层
7 Cos Bid for Bibiyana Power Plant
25/5/2009
Seven pre-qualification documents have been submitted on the closing day for the installation of the 450 megawatts (MW) gas-fired Bibiyana power plant.
Three local companies and their joint venture partners along with four foreign companies have submitted the documents for setting up the plant at Bibiyana.
The local companies and their joint ventures that submitted the pre-qualification documents include Summit Industrial and Mercantile Corporation (Pvt) Ltd and its partner GE Energy LLC Bangladesh, Shasha Denims and its joint venture partner MPC Consortium of Meiya Power Company Ltd (Hong Kong).
Local Otobi Ltd and Asian Entech Power Corporation Ltd have submitted documents jointly with China National Machinery and Equipment Import and Export Corporation (CMEC), Shenzen Shenwan Power Gas Turbine Engineering Technique Company Ltd (NSRD).
Two UK-based companies Independent Power Corporation PLC, England and Globeleq Advisers Ltd, England -- have submitted documents independently for construction of the plant.
Two Malaysian companies - YTL Power International Berhard, Malaysia and Ranhill Berhard, Malaysia - also submitted documents separately.
[ 本帖最后由 klagigi 于 25-5-2009 09:59 AM 编辑 ] |
|
|
|
|
|
|
|
|
|
|
发表于 25-5-2009 09:56 AM
|
显示全部楼层
YTL submits proposal for Bangladesh project again
2009/04/27
YTL Power International Bhd (6742) has resubmitted a proposal for the 450MW Bibiyana power plant project in Bangladesh, that is being re-tendered for the second time within a year.
The utility submitted a bid for Bibiyana power plant project in 2007 but was disqualified at the final stage of the bidding process.
Apart from YTL Power, Ranhill Bhd has also submitted a pre qualification bid.
Bangladeshi news reports say the evaluation committee headed by the Power Cell will commence its review this Sunday and qualification will be announced within the next two or three weeks, with the final round of bidding in May.
The winning bid is expected to be announced by June.
Power Cell is a unit set up by the Bangladesh's Ministry of Power, Energy and Mineral Resources to carry forward the power sector reforms activities in Bangladesh.
The Bibiyana independent power plant project, which is expected to be in production by 2013 or 2014, will be implemented on a build-own-operate basis.
This is the second time Power Cell is processing the tender for Bibiyana power project, after the Bangladesh Cabinet rejected the winning bid last year.
Last year, a Malaysian-Korean consortium led by Powertek Bhd, won the bid, with a power price offer almost double the tariff of the previous large private power projects. - By Kamarul Yunus
http://www.btimes.com.my/Current_News/BTIMES/articles/ytlbib/Article/index_html |
|
|
|
|
|
|
|
|
| |
本周最热论坛帖子
|