回复 120# qoqaqola 的帖子
怎样做呢?
做几个 mould?
1m3 per mould? |
|
|
|
|
|
|
|
发表于 11-1-2008 06:13 PM
|
显示全部楼层
请问在这里的朋友知不知道如何算出CONCRETE PLINTH(FOUNDATION)的M3要用多少?
9000mm(L) x 3000mm(W) x 1000mm(H)
GRADE 20 = ?
GRADE 25 = ?
GRADE 30 = ?
请指教下,谢谢! |
|
|
|
|
|
|
|
发表于 11-1-2008 07:53 PM
|
显示全部楼层
原帖由 范文芳 于 11-1-2008 06:13 PM 发表 ![](http://chinese3.cari.com.my/myforum/images/common/back.gif)
请问在这里的朋友知不知道如何算出CONCRETE PLINTH(FOUNDATION)的M3要用多少?
9000mm(L) x 3000mm(W) x 1000mm(H)
GRADE 20 = ?
GRADE 25 = ?
GRADE 30 = ?
请指教下,谢谢!
27M3(没有扣除Reinforcement及M&E Service)
Concrete Grade与Volome是没有联系的。
什么Grade的Concrete的1M3都是一样。 |
|
|
|
|
|
|
|
![](static/image/common/ico_lz.png)
楼主 |
发表于 11-1-2008 08:30 PM
|
显示全部楼层
其实怎样算都好,现场 control 最重要。。。 |
|
|
|
|
|
|
|
发表于 11-1-2008 08:33 PM
|
显示全部楼层
|
|
|
|
|
|
|
![](static/image/common/ico_lz.png)
楼主 |
发表于 11-1-2008 08:40 PM
|
显示全部楼层
|
|
|
|
|
|
|
发表于 11-1-2008 08:54 PM
|
显示全部楼层
|
|
|
|
|
|
|
发表于 20-2-2008 06:51 PM
|
显示全部楼层
说说吧
concrete truck 最少1.5m3的,因为它truck drum mix的关系,太扫的volumn cannot mix,
normally we at the last truck calculate the concrete needed, not calclate on plan,
that is the fresh training or qs done the things.
cos 1st load u casting , u already known that part struct size can fill how much!
normally building structure is design on left and right similar 80% same
becaful, truck is unbelivable o, have to spot chk all the time, like how many drum for m3
they on hosting casting per load.
if lazy de, ask the crane worker or casting concrete work that better u calculate loh |
|
|
|
|
|
|
|
发表于 20-2-2008 06:55 PM
|
显示全部楼层
回复 46# 等等 的帖子
good good ![](static/image/smiley/default/loveliness.gif) |
|
|
|
|
|
|
|
发表于 21-2-2008 07:10 PM
|
显示全部楼层
|
|
|
|
|
|
|
发表于 24-2-2008 08:16 PM
|
显示全部楼层
回复 130# 杀千刀 的帖子
很难讲叫 QS 帮你算,他那边那里知道你要 cast 那里。。。 |
|
|
|
|
|
|
|
发表于 25-2-2008 12:50 PM
|
显示全部楼层
回复 131# 弗兰 的帖子
跟他讲大约在那里就可以了罗![](static/image/smiley/default/3shakehead.gif) |
|
|
|
|
|
|
|
发表于 29-2-2008 11:31 PM
|
显示全部楼层
回复 117# darkelf 的帖子
that is lie u de...
but almost is not l\kurang lah..becouse it kira by mesin ....
but,,....mesin also can rosak de loh....
if not kira baik baik....rugi is u..
( sorry...this cc no chinese version...and my english is not good...so hope u understand what i'm talking now..haha^^ ) |
|
|
|
|
|
|
|
发表于 29-2-2008 11:34 PM
|
显示全部楼层
回复 118# forever_consern 的帖子
if slab and bean need concrete togerther ( alsmost slab and bean is togerther concrete de loh.) then...u kira the slab concrete 1st ..and then kira the bean de concret...then + this 2 thing....then will get the answer |
|
|
|
|
|
|
|
发表于 29-2-2008 11:38 PM
|
显示全部楼层
回复 130# 杀千刀 的帖子
QS is not helping u kira concrete de loh....
this kind job is almost doing by sub-con , but main-con also need kira too..becouse scared sub-son kira more....
just like u say de...more 1m concrete the call him take back is right...but if i'm u boss...i'm the 1st person to sotong u..u know why?? becouse u bazir my concrete.....u know each meter concrete how much??? |
|
|
|
|
|
|
|
发表于 1-3-2008 06:41 PM
|
显示全部楼层
|
|
|
|
|
|
|
发表于 1-3-2008 09:53 PM
|
显示全部楼层
回复 135# 飞吻 的帖子
如果是 suspended slab, 算 beam 是要扣掉slab 的 thickness |
|
|
|
|
|
|
|
发表于 2-3-2008 07:15 PM
|
显示全部楼层
回复 136# 杀千刀 的帖子
1m concrete is just not just RM150 loh...u think grade 15-20 meah..??
and by the way...u boss is rich loh...
just like u say de.....each time call more 1m and bazir it..then each day also we concreting.....1 month = 30x RM 150 = u bazir RM 4500
if like that..batter u call u boss find a guy to just kira concete and pay him RM2000 also got untung lah.. |
|
|
|
|
|
|
|
发表于 3-3-2008 01:48 PM
|
显示全部楼层
|
|
|
|
|
|
|
发表于 3-3-2008 04:43 PM
|
显示全部楼层
楼上的两位,请用中文发表!如再重犯,将被扣分,谢谢合作!
|
|
|
|
|
|
|
| |
本周最热论坛帖子
|