佳礼资讯网

 找回密码
 注册

ADVERTISEMENT

楼主: williamnkk81

【MALAKOF 5264 交流专区】马拉卡

  [复制链接]
发表于 1-2-2020 06:35 AM | 显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
30 Sep 2019
INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
30 Sep 2019
30 Sep 2018
30 Sep 2019
30 Sep 2018
$$'000
$$'000
$$'000
$$'000
1Revenue
1,859,036
1,912,676
5,681,171
5,460,962
2Profit/(loss) before tax
138,979
165,395
393,233
402,720
3Profit/(loss) for the period
112,019
98,446
255,893
229,433
4Profit/(loss) attributable to ordinary equity holders of the parent
94,494
83,498
213,748
188,950
5Basic earnings/(loss) per share (Subunit)
1.93
1.70
4.37
3.82
6Proposed/Declared dividend per share (Subunit)
0.00
0.00
2.44
2.10


AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent ($$)
1.1300
1.1500

回复

使用道具 举报


ADVERTISEMENT

发表于 19-3-2020 08:11 AM | 显示全部楼层
MALAKOFF CORPORATION BERHAD

Date of change
30 Nov 2019
Name
CIK SHARIFAH SOFIA BINTI SYED MOKHTAR SHAH
Age
26
Gender
Female
Nationality
Malaysia
Designation
Non-Independent Director
Directorate
Non Independent and Non Executive
Type of change
Resignation
Reason
Ceased as nominee director of indirect major shareholder of the Company
Details of any disagreement that he/she has with the Board of Directors
No
Whether there are any matters that need to be brought to the attention of shareholders
No
Qualifications
No
Qualifications
Major/Field of Study
Institute/University
Additional Information
1
Masters
Master in Development Management
London School of Economics and Political Science, United Kingdom ("UK")
2
Degree
Bachelor of Science in Economics
University of York, UK

Working experience and occupation
January 2017 to October 2017 - Pos Malaysia Berhad - Special Officer to the Group Chief Executive Officer.October 2015 to May 2016 - Bill & Melinda Gates Foundation (External Consultant).June 2014 to August 2014 - Morgan Stanley, Singapore (Summer Analyst, Investment Banking).March 2014 to April 2014 - Grameen Bank, Bangladesh. July 2013 - Congressional Internship, Washington, DC.March 2013 to April 2013 - Islamic Arts Museum, Malaysia.February 2013 - Insight Day at PricewaterhouseCoopers, Manchester, UK
Family relationship with any director and/or major shareholder of the listed issuer
She is the daughter to YBhg. Tan Sri Dato' Seri Syed Mokhtar Shah bin Syed Nor, an indirect major shareholder of MMC Corporation Berhad, which is a major shareholder of the Company.

回复

使用道具 举报

发表于 31-3-2020 07:01 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
Malakoff Corporation Berhad ("MCB" or "the Company") - BATU BOR HIDRO SDN. BHD. AND LUBUK PAKU HIDRO SDN. BHD, THE INDIRECT SUBSIDARIES OF THE COMPANY, ARE SELECTED AS THE SUCCESSFUL BIDDERS IN A COMPETITIVE FEED-IN TARIFF E-BIDDING SMALL HYDRO TENDER EXERCISE BY THE GOVERNMENT OF MALAYSIA
Introduction
Following the announcement made by the Company on 18 September 2019, the Board of Directors of MCB is pleased to announce that Batu Bor Hidro Sdn Bhd and Lubuk Paku Hidro Sdn Bhd (collectively referred to as “SPVs”), the 65%-owned indirect subsidiaries of MCB with the remaining 35% interest owned by Touch Meccanica Sdn Bhd, have been selected as the successful bidders in a competitive Feed-in Tariff (“FiT”) e-bidding small hydro tender exercise (“Project”) by the Government of Malaysia through Sustainable Energy Development Authority Malaysia (“SEDA”) on 23 December 2019. The announcement is published on SEDA website, as attached.

Salient terms of the Project
The SPVs will be awarded as the Feed-in-Approval holders and subsequently enter into a Renewable Energy Power Purchase Agreement (“REPPA”) with Tenaga Nasional Berhad (“TNB”) for the small hydro projects located in Peninsular Malaysia with the following capacity for a period of 21 years.
SPVs
Installed Capacity (MW)
         Bid Tariff (RM)
Batu Bor Hidro Sdn. Bhd.
Lubuk Paku Hidro Sdn. Bhd.
                     30
                     25
               0.29/kwh
               0.29/kwh
Financial effects
The Project is not expected to have any material impact on the earnings and net assets of the MCB Group for the financial year ending 31 December 2019.

Declaration of interest
None of the Directors, major shareholders of MCB and persons connected to them has any interest, direct or indirect, in the Project.

MCB will make further announcement(s) as and when there are any material developments in relation to the Project.

This announcement is dated 23 December 2019.
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3011593

回复

使用道具 举报

发表于 16-4-2020 07:34 AM | 显示全部楼层
MALAKOFF CORPORATION BERHAD

Date of change
01 Feb 2020
Name
ENCIK HABIB BIN HUSIN
Age
60
Gender
Male
Nationality
Malaysia
Type of change
Retirement
Designation
Chief Operating Officer
Qualifications
No
Qualifications
Major/Field of Study
Institute/University
Additional Information
1
Degree
Engineering (Electrical and Electronics)
University of Wales, United Kingdom
  
Working experience and occupation
He has vast experience in the field of engineering, management and corporate.
Family relationship with any director and/or major shareholder of the listed issuer
None
Any conflict of interests that he/she has with the listed issuer
None
Details of any interest in the securities of the listed issuer or its subsidiaries
Encik Habib holds 360,000 ordinary shares in MCB pursuant to the initial public offering of shares in MCB.

回复

使用道具 举报

发表于 23-4-2020 04:47 AM | 显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
31 Dec 2019
INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
31 Dec 2019
31 Dec 2018
31 Dec 2019
31 Dec 2018
$$'000
$$'000
$$'000
$$'000
1Revenue
1,741,101
1,887,268
7,422,272
7,348,230
2Profit/(loss) before tax
137,671
156,453
530,904
559,173
3Profit/(loss) for the period
118,793
94,047
374,686
323,480
4Profit/(loss) attributable to ordinary equity holders of the parent
106,405
85,483
320,153
274,433
5Basic earnings/(loss) per share (Subunit)
2.18
1.75
6.55
5.56
6Proposed/Declared dividend per share (Subunit)
4.11
3.50
6.55
5.60


AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent ($$)
1.1200
1.1500

回复

使用道具 举报

发表于 16-5-2020 08:09 AM | 显示全部楼层
MALAKOFF CORPORATION BERHAD

Entitlement subject
Final Dividend
Entitlement description
Final dividend of 4.11 sen per share for the financial year ended 31 December 2019
Ex-Date
14 May 2020
Entitlement date
15 May 2020
Entitlement time
04:00 PM
Financial Year End
31 Dec 2019
Period

Share transfer book & register of members will be
15 May 2020 to 15 May 2020 closed from (both dates inclusive) for the purpose of determining the entitlement
Payment Date
12 Jun 2020
a.Securities transferred into the Depositor's Securities Account before 4:30 pm in respect of transfers
15 May 2020
b.Securities deposited into the Depositor's Securities Account before 12:30 pm in respect of securities exempted from mandatory deposit

c. Securities bought on the Exchange on a cum entitlement basis according to the Rules of the Exchange.
Number of new shares/securities issued (units)
(If applicable)

Entitlement indicator
Currency
Announced Currency
Malaysian Ringgit (MYR)
Disbursed Currency
Malaysian Ringgit (MYR)
Entitlement in Currency
Malaysian Ringgit (MYR) 0.0411

回复

使用道具 举报

Follow Us
发表于 8-6-2020 08:42 AM | 显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
31 Mar 2020
INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
31 Mar 2020
31 Mar 2019
31 Mar 2020
31 Mar 2019
$$'000
$$'000
$$'000
$$'000
1Revenue
1,773,973
2,007,345
1,773,973
2,007,345
2Profit/(loss) before tax
140,204
131,442
140,204
131,442
3Profit/(loss) for the period
103,312
79,618
103,312
79,618
4Profit/(loss) attributable to ordinary equity holders of the parent
89,178
67,004
89,178
67,004
5Basic earnings/(loss) per share (Subunit)
1.82
1.37
1.82
1.37
6Proposed/Declared dividend per share (Subunit)
0.00
0.00
0.00
0.00


AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent ($$)
1.1000
1.1300

回复

使用道具 举报

发表于 10-6-2020 08:31 AM | 显示全部楼层
icy97 发表于 31-3-2020 07:01 AM
Financial effectsThe Project is not expected to have any material impact on the earnings and net assets of the MCB Group for the financial year ending 31 December 2019.
Declaration of interestNone of ...

Type
Announcement
Subject
OTHERS
Description
Malakoff Corporation Berhad ("MCB" or "the Company")- Renewable Energy Power Purchase Agreements ("REPPAs") between Batu Bor Hidro Sdn Bhd ("BBHSB") and Tenaga Nasional Berhad ("TNB"), and between Lubuk Paku Hidro Sdn Bhd ("LPHSB") and TNB for the Proposed Development of Two Small Hydro Projects in Pahang (collectively "Projects")
(Unless otherwise stated, the definitions used in this announcement are the same as those used in the announcement dated 23 December 2019)

Introduction
Further to our announcements on 18 September 2019, 23 December 2019 and 26 December 2019, the Board of Directors of MCB wishes to announce that its indirect 65%-owned subsidiaries, BBHSB and LPHSB, had entered into their respective REPPA with TNB for the Projects.

Details of Transaction
Both BBHSB and LPHSB had participated in a competitive e-bidding exercise for the Projects and submitted their bids on 20 September 2019 (“Bids”). Sustainable Energy Development Authority (“SEDA”) Malaysia had on 23 December 2019 accepted the Bids from BBHSB and LPHSB and selected BBHSB and LPHSB as the successful bidders for the Projects which were awarded with the Feed-in Tariff (“FiT”) quotas.
Pursuant thereto and as required by SEDA, BBHSB and LPHSB had entered into the REPPAs with TNB for the sale and purchase of renewable energy generated from the Projects for a period of 21 year. The REPPAs regulate and govern the rights and obligations of TNB and BBHSB, and TNB and LPHSB in relation to the Projects.
The salient terms of REPPAs are as below:
1.     Term:
  • From the Effective Date and to continue throughout the effective period of 21 years commencing from Commercial Operation Date (“COD”).
2.     Sale and Purchase obligations:
  • BBHSB and LPHSB, as the Feed-In Approval (“FIA”) Holders, shall sell and deliver and TNB, as the Distribution Licensee (“DL”), shall purchase and accept the test renewable energy during Initial Operation Date (“IOD”). The FIA Holder shall sell and deliver and the DL shall purchase and accept the metered renewable energy starting on COD.

Financial Impact
The executions of the REPPAs by BBHSB and LPHSB with TNB are not expected to have any material impact on the earnings and net assets of the MCB Group for the financial year ending 31 December 2020.

Declaration of Interest
None of the Directors and/or major shareholders of MCB or persons connected to them have any interest, direct or indirect, in the REPPAs.
MCB will make further announcement(s) as and when there are material developments in relation to the Projects.

This announcement is dated 22 May 2020.



回复

使用道具 举报


ADVERTISEMENT

发表于 11-7-2020 09:00 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
Malakoff Corporation Berhad ("MCB" or "the Company")- Renewable Energy Power Purchase Agreements ("REPPAs") between Batu Bor Hidro Sdn Bhd ("BBHSB") and Tenaga Nasional Berhad ("TNB"), and between Lubuk Paku Hidro Sdn Bhd ("LPHSB") and TNB for the Proposed Development of Two Small Hydro Projects in Pahang (collectively "Projects")
(Unless otherwise stated, the definitions used in this announcement are the same as those used in the announcement dated 23 December 2019)

We refer to the Company’s announcement made on 22 May 2020 in relation to the Projects.

We wish to clarify that the REPPAs between BBHSB and TNB, and between LPHSB and TNB were entered into on 20 May 2020. The REPPAs shall take effect on the Effective Date and continue in effect throughout the effective period of 21 years from the Scheduled Feed-in-Tariff Commencement Date of 24 December 2024 as stated in the Feed-in Approval, unless earlier terminated in accordance with the provisions of the REPPAs. The Effective Date shall occur when the REPPAs are registered by Sustainable Energy Development Authority Malaysia (“Authority”) pursuant to subsection 12(6) of the Renewable Energy Act 2011 (“Act”).

MCB will make further announcement upon the occurrence of the Effective Date of the REPPAs.

This announcement is dated 29 May 2020.



回复

使用道具 举报

发表于 11-10-2020 08:25 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
SETTLEMENT AGREEMENT BETWEEN TANJUNG BIN ENERGY SDN BHD AND TANJUNG BIN ENERGY ISSUER BERHAD OF THE ONE PART, AND ALSTOM POWER SYSTEMS AND GE POWER SERVICES (MALAYSIA) SDN BHD OF THE OTHER PART IN RELATION TO THE CLAIMS ARISING FROM THE FAILURE EVENTS ("CLAIMS") AT THE 1 X 1000MW COAL FIRED POWER PLANT LOCATED IN TANJUNG BIN, JOHOR, MALAYSIA ("PLANT") THAT OCCURRED BETWEEN APRIL 2017 AND JUNE 2019 (COLLECTIVELY REFERRED TO AS "FAILURE EVENTS")
Malakoff Corporation Berhad (“MCB”) wishes to announce that its wholly owned subsidiaries, Tanjung Bin Energy Sdn Bhd and Tanjung Bin Energy Issuer Berhad (collectively referred to as “Owner”), have on 30 June 2020 entered into a settlement agreement (“Settlement Agreement”) with Alstom Power Systems and GE Power Services (Malaysia) Sdn Bhd (collectively referred to as “GE”) in order to resolve and settle the Claims arising from the Failure Events at the Plant upon the terms and conditions of the aforementioned agreement.

The Owner has raised the Claims against GE under the Engineering, Procurement and Construction Contract dated 23 February 2012 in relation to the losses and damages that the Owner suffered as a result of the Failure Events that occurred at the Plant between April 2017 and June 2019. Pursuant to the Settlement Agreement, the Owner and GE have agreed to waive, release and relinquish all their respective rights or interest in the Claims in consideration of the agreed settlement package which comprises inter alia supply and provision of parts, services and training by GE to the Owner, either without any charge or a discounted rate, as more particularly set out below:

1. Transfer of left-over commissioning spares from GE to the Owner;
2. Replacement of Automatic Voltage Regulator by GE;
3. Provision of warranty extension of the Power Block for 24 months;
4. Provision of resident engineer for 3 years;
5. Provision of 360 engineer hours and Distributed Control System (DCS) support;
6. Pre-agreed discount on GE’s rates under Multi-Year Maintenance Program and Training Proposal;
7. Cancellation of GE’s claims in relation to the replacement of 104 tubes in the Finishing Reheater;
8. Cancellation of GE’s claims in relation to the Booster Fan for Sea Water Flue Gas Desulfurization (SWFGD) system;
9. Owner’s waiver of claims against GE, including disputed defect notification requests (DNRs) and warranty claims that have arisen or might have arisen prior to and until the end of the extended warranty period (i.e. 20 March 2020);
10. Pre-agreed volume discount for RM90 million parts and services by GE; and
11. Provision of the following parts by GE free-of-charge:
      a) Steam Turbine Mobile Skid Force Cooling; and
      b) Generator Step Up Transformer.

The execution of the Settlement Agreement would enable the Owner to work closely with GE to further improve the reliability and cost efficiency of the Plant.  

This announcement is dated 30 June 2020.



回复

使用道具 举报

发表于 15-12-2020 07:39 AM | 显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
30 Jun 2020
INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
30 Jun 2020
30 Jun 2019
30 Jun 2020
30 Jun 2019
$$'000
$$'000
$$'000
$$'000
1Revenue
1,506,169
1,814,790
3,280,142
3,822,135
2Profit/(loss) before tax
162,523
122,812
302,727
254,254
3Profit/(loss) for the period
114,998
64,256
218,310
143,874
4Profit/(loss) attributable to ordinary equity holders of the parent
104,959
52,250
194,137
119,254
5Basic earnings/(loss) per share (Subunit)
2.15
1.07
3.97
2.44
6Proposed/Declared dividend per share (Subunit)
2.80
2.44
2.80
2.44


AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent ($$)
1.1000
1.1300

回复

使用道具 举报

发表于 15-12-2020 07:39 AM | 显示全部楼层
MALAKOFF CORPORATION BERHAD

Entitlement subject
Interim Dividend
Entitlement description
Interim dividend of 2.80 sen per ordinary share for the financial year ending 31 December 2020
Ex-Date
15 Sep 2020
Entitlement date
17 Sep 2020
Entitlement time
04:00 PM
Financial Year End
31 Dec 2020
Period

Share transfer book & register of members will be
17 Sep 2020 to 17 Sep 2020 closed from (both dates inclusive) for the purpose of determining the entitlement
Payment Date
16 Oct 2020
a.Securities transferred into the Depositor's Securities Account before 4:30 pm in respect of transfers
17 Sep 2020
b.Securities deposited into the Depositor's Securities Account before 12:30 pm in respect of securities exempted from mandatory deposit

c. Securities bought on the Exchange on a cum entitlement basis according to the Rules of the Exchange.
Number of new shares/securities issued (units)
(If applicable)

Entitlement indicator
Currency
Announced Currency
Malaysian Ringgit (MYR)
Disbursed Currency
Malaysian Ringgit (MYR)
Entitlement in Currency
Malaysian Ringgit (MYR) 0.0280

回复

使用道具 举报

发表于 19-1-2021 07:55 AM | 显示全部楼层
Type
Announcement
Subject
TRANSACTIONS (CHAPTER 10 OF LISTING REQUIREMENTS)
RELATED PARTY TRANSACTIONS
Description
Malakoff Corporation Berhad ("MCB" or "Company")Proposed acquisition of the land held under title No. GRN 57532, Lot 16277, located in Mukim Pulau Sebang, Daerah Alor Gajah, Melaka measuring approximately 71.44 hectares ("Proposed Land Acquisition" or the "Proposal").
The Board of Directors of MCB wishes to announce that Malakoff R&D Sdn Bhd, a wholly-owned subsidiary of the Company, had on 22 September 2020 entered into a Sale and Purchase Agreement (“SPA”) with Eksklusif Pesona Sdn Bhd to acquire a plot of freehold land of approximately 71.44 hectares or 176.5 acres in size held under title No. GRN 57532, Lot 16277, located in Mukim Pulau Sebang, Daerah Alor Gajah, Melaka for a purchase consideration of Ringgit Malaysia One Hundred and Fifty Million (RM150,000,000.00) subject to any adjustment thereto in accordance with the terms of the SPA.

In view of the interests of certain directors and major shareholders of the Company, the Proposed Land Acquisition is deemed a related party transaction under Paragraph 10.08 of the Main Market Listing Requirements of Bursa Malaysia Securities Berhad.

Please refer to the attachment for the full announcement in relation to the Proposal.

This announcement is dated 22 September 2020.
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3089800

回复

使用道具 举报

发表于 25-1-2021 09:25 AM | 显示全部楼层
Type
Reply to Query
Reply to Bursa Malaysia's Query Letter - Reference ID
IQL-24092020-00003
Subject
Proposed acquisition by Malakoff R&D Sdn Bhd (MRAD), a wholly-owned subsidiary of Malakof Corporation Berhad (Malakof), of a freehold land held under the title No. GRN 57532, Lot16277, located in Mukim Pulau Sebang, Daerah Alor Gajah, Melaka (Land) from Eksklusif Pesona Sdn Bhd (EPSB) for a purchase price of RM150,000,000 (Proposed Acquisition)
Description
Malakoff Corporation Berhad ("MCB" or "Company")Proposed acquisition of the land held under title No. GRN 57532, Lot 16277, located in Mukim Pulau Sebang, Daerah Alor Gajah, Melaka measuring approximately 71.44 hectares ("Proposed Land Acquisition" or "the Proposal")
Query Letter Contents
We refer to your Company’s announcement dated 22 September 2020 in respect of the aforesaid matter.
In this connection, kindly furnish Bursa Securities with the following additional information for public release:-
  • The net book value of the land based on EPSB latest audited accounts.
  • The encumbrances of the Land, if any.
  • Quantification of the market value as appraised by the independent registered valuer.
  • The  breakdown of sources of funds to MRAD/Malakof  for the Proposed Acquisition between internally generated funds and external borrowings.
  • Effects of the Proposed Acquisition on gearing of Malakof.
  • Whether the Proposed Acquisition  is subject to shareholders’ approval.
  • Prospects of the Land.
  • Proposed use of the Land pending its development. If to be let out, the details of the rentals and the rental income or expected rental income per month or per annum.
Reference is made to the announcement dated 22 September 2020 in relation to the Proposed Land Acquisition. Unless otherwise stated, words and phrases used in this announcement shall have the same meaning as defined in the announcement dated 22 September 2020.

We refer to Bursa Securities' letter dated 24 September 2020 in respect of our announcement dated 22 September 2020 in relation to the Proposed Land Acquisition.

Kindly refer to the attachment for further details on the Proposed Land Acquisition.

This announcement is dated 25 September 2020.
Attachments

回复

使用道具 举报

发表于 17-2-2021 09:43 AM | 显示全部楼层
MALAKOFF CORPORATION BERHAD

Date of change
31 Oct 2020
Name
DATO' AHMAD FUAAD BIN MOHD KENALI
Age
50
Gender
Male
Nationality
Malaysia
Type of change
Resignation
Designation
Chief Executive Officer
Reason
To pursue other career opportunity
Details of any disagreement that he/she has with the Board of Directors
No
Whether there are any matters that need to be brought to the attention of shareholders
No
Qualifications
No
Qualifications
Major/Field of Study
Institute/University
Additional Information
1
Others
Fellow
The Association of Chartered Certified Accountants (ACCA)
FCCA
2
Others
Member
The Malaysian Institute of Certified Public Accountants (MICPA)
CPA
3
Others
Member
The Malaysian Institute of Accountants (MIA)
CA
4
Degree
Computerised Accountancy
University of East Anglia, United Kingdom
BSc (Hons)
5
Others
Business & Finance
Business and Technology Education Council (BTEC)
National Diploma
  
Working experience and occupation
Dato' Ahmad Fuaad was the Chief Executive Officer of Proton Holdings Berhad ("PHB") from 1 April 2016 and board member of the PHB Group until 30 September 2017. Prior to his appointment in PHB, he was the Chief Operating Officer - Finance & Corporate and Chief Financial Officer of DRB-HICOM Berhad from August 2013 to March 2016.He began his career with Arthur Andersen & Co in 1994. In 2001, he left practice to take up the position of Executive Director of Finance at Petaling Garden Berhad. In 2008, he rejoined practice as a Partner/Executive Director in Ernst & Young, Kuala Lumpur and was with the firm until 2010 when he joined Astro Malaysia Holdings Berhad as the Chief Financial Officer from August 2010 to July 2013.Dato' Ahmad Fuaad was a board member of key subsidiaries of the DRB-HICOM Berhad Group such as Pos Malaysia Berhad, Bank Muamalat Malaysia Berhad, Edaran Otomobil Nasional Berhad, Horsedale Development Berhad, Glenmarie Properties Sdn Bhd and Alam Flora Sdn Bhd. During his tenure in Malakoff Corporation Berhad, Dato' Ahmad Fuaad sits on the Board of majority of its local and overseas subsidiaries and associate companies.

回复

使用道具 举报

发表于 9-3-2021 08:50 AM | 显示全部楼层
MALAKOFF CORPORATION BERHAD

Date of change
01 Dec 2020
Name
ENCIK ANWAR SYAHRIN BIN ABDUL AJIB
Age
47
Gender
Male
Nationality
Malaysia
Designation
Managing Director
Directorate
Executive
Type of change
Appointment
Qualifications
No
Qualifications
Major/Field of Study
Institute/University
Additional Information
1
Others
Fellow Chartered Accountant (FCA)
Institute of Chartered Accountants England and Wales, United Kingdom
2
Others
Member
Malaysian Institute of Accountants, Malaysia
3
Masters
Business Administration (MBA)
University of Salford, United Kingdom
4
Degree
Mechanical Engineering
Imperial College of Science, Technology and Medicine, London, United Kingdom

Working experience and occupation
- Managing Director/Chief Executive Officer, UEM Sunrise Berhad (September 2014 to October 2020)- Group Head, Ports and Logistics Division, MMC Corporation Berhad ("MMC") (January-August 2014)- Director, Finance/Group Chief Financial Officer, MMC (June 2008 - August 2014)- Chief Financial Officer, Pelabuhan Tanjung Pelepas Sdn Bhd (April 2006 - May 2008) - Managing Director/Consultant, Business Associates Consulting Sdn Bhd (December 2002 - March 2006)- Senior Associate/Chartered Accountant (Assurance and Business Advisory), Arthur Andersen/Ernst & Young Kuala Lumpur (January 2002 - November 2002)- Senior Associate (Assurance and Business Advisory), Arthur Andersen Manchester, United Kingdom (August 1998 - March 2001)- Executive (Fleet Distribution), Shell Malaysia Trading Sdn Bhd (August 1996 - March 1998)
Directorships in public companies and listed issuers (if any)
Listed companies:1. UEM Sunrise BerhadPublic companies:1. UEM Land Berhad2. Sunrise Berhad3. ONE15 Marina Development Berhad (The abovementioned directorships in the subsidiaries of UEM Sunrise Berhad are by virtue of Encik Anwar Syahrin's position as the Managing Director/Chief Executive Officer of UEM Sunrise Berhad. He will relinquish his directorships in these companies upon his resignation from UEM Sunrise Berhad)

回复

使用道具 举报


ADVERTISEMENT

发表于 5-6-2021 08:33 AM | 显示全部楼层
本帖最后由 icy97 于 11-6-2021 08:34 AM 编辑

Type
Announcement
Subject
OTHERS
Description
Malakoff Corporation Berhad ("MCB")- Award of Feed-in Tariff Approval for a 2.4MW Biogas Power Project in Ulu Sebol, Kota Tinggi, Johor Darul Takzim
Introduction
The Board of Directors of MCB is pleased to announce that Southern Biogas Sdn Bhd (“SBSB”), a 60%-owned indirect subsidiary of MCB, had on 18 November 2020 received the Feed-in Tariff approval from the Government of Malaysia through Sustainable Energy Development Authority (“SEDA”) to undertake the development of 2.4MW Biogas Power Plant in Ulu Sebol, Kota Tinggi, Johor Darul Takzim (“Project”).
SBSB had participated in a competitive e-bidding exercise for the Project and submitted its bid to SEDA on 5 June 2020 (“Bid”). SEDA has accepted SBSB’s Bid and selected SBSB as the successful bidder.

Financial impact
The Project is not expected to have any material impact on the earnings and net assets of MCB Group for the financial year ending 31 December 2020.

Declaration of interest
None of the Directors, major shareholders of MCB and persons connected to them has any interest, direct or indirect, in the Project.
MCB will make further announcement(s) as and when there is any material development in relation to the Project.

This announcement is dated 19 November 2020.


SUMMARY OF KEY FINANCIAL INFORMATION
30 Sep 2020
INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
30 Sep 2020
30 Sep 2019
30 Sep 2020
30 Sep 2019
$$'000
$$'000
$$'000
$$'000
1Revenue
1,482,895
1,859,036
4,763,037
5,681,171
2Profit/(loss) before tax
67,585
138,979
370,312
393,233
3Profit/(loss) for the period
60,588
112,019
278,898
255,893
4Profit/(loss) attributable to ordinary equity holders of the parent
50,802
94,494
244,939
213,748
5Basic earnings/(loss) per share (Subunit)
1.04
1.93
5.01
4.37
6Proposed/Declared dividend per share (Subunit)
0.00
0.00
2.80
2.44


AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent ($$)
1.1000
1.1300


回复

使用道具 举报

发表于 18-11-2021 08:57 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
Malakoff Corporation Berhad ("MCB" or "Company")- Notices of Assessment issued by Inland Revenue Board of Malaysia ("IRB") to Kapar Energy Ventures Sdn Bhd ("KEV")
MCB wishes to announce that on 1 November 2021, KEV, a 40%-owned associate of MCB, had received notices of assessment dated 29 October 2021 from the IRB for the years of assessment 2011, 2012 and 2014 and notices of additional assessment for the years of assessment 2013, 2015, 2016, 2017 and 2018 (collectively referred to as “Notices of Assessment”) amounting in aggregate to RM595,948,256.18 (“Additional Income Tax”).

The IRB has imposed the Additional Income Tax based on its view that certain interest expenses incurred by KEV are not allowed under Section 33(1)(a) of the Income Tax Act 1967.

Upon consulting its tax counsel and solicitors, KEV is of the view that there are reasonable grounds to challenge the Notices of Assessment raised by the IRB.

The Board of KEV is currently deliberating on the next course of action. MCB will make further announcements if there are any material developments in respect of the foregoing.

This announcement is dated 5 November 2021.

回复

使用道具 举报

发表于 12-1-2022 09:10 AM | 显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
30 Sep 2021
INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
30 Sep 2021
30 Sep 2020
30 Sep 2021
30 Sep 2020
$$'000
$$'000
$$'000
$$'000
1Revenue
1,583,751
1,482,895
4,519,367
4,763,037
2Profit/(loss) before tax
118,584
67,585
404,960
370,312
3Profit/(loss) for the period
72,738
60,588
276,547
278,898
4Profit/(loss) attributable to ordinary equity holders of the parent
67,160
50,802
245,338
244,939
5Basic earnings/(loss) per share (Subunit)
1.37
1.04
5.02
5.01
6Proposed/Declared dividend per share (Subunit)
0.00
0.00
3.10
2.80


AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent ($$)
1.1200
1.0900

回复

使用道具 举报

发表于 17-3-2022 11:40 AM | 显示全部楼层
MALAKOFF CORPORATION BERHAD

Date of change
31 Dec 2021
Name
DATUK HJ HASNI BIN HARUN
Age
64
Gender
Male
Nationality
Malaysia
Designation
Chairman
Directorate
Independent and Non Executive
Type of change
Resignation
Reason
Due to other personal commitment




Date of change
01 Jan 2022
Name
TAN SRI DATUK DR IR. AHMAD TAJUDDIN BIN ALI
Age
73
Gender
Male
Nationality
Malaysia
Designation
Chairman
Directorate
Independent and Non Executive
Type of change
Appointment
Qualifications
No
Qualifications
Major/Field of Study
Institute/University
Additional Information
1
Doctorate
Ph.D, Nuclear Engineering
Queen Mary College, University of London
2
Degree
B.Sc (Eng) Honours, Mechanical Engineering (First Class)
King’s College, University of London
3
Others
Post-doctoral work in Nuclear Engineering
Oregon State University, USA
4
Others
Post-doctoral work in Nuclear Engineering
Pennsylvania State University, USA
5
Others
Foundation Fellow
Academy of Sciences, Malaysia (F.A.Sc.)
6
Others
Senior Fellow
Academy of Sciences, Malaysia (Academician)
7
Others
Fellow
Institution of Engineers Malaysia (F.I.E.M.)
8
Others
Registered Professional Engineer (P.Eng.)
Board of Engineers Malaysia
9
Others
Fellow
The ASEAN Federation of Engineering Organizations (A.F.E.O.)
10
Others
Fellow
The ASEAN Academy of Engineering and Technology (A.A.E.T.)

Working experience and occupation
-        Independent Non-Executive Chairman, Optimax Holdings Berhad (20 January 2020 - current)-        Independent Non-Executive Chairman, Linde Malaysia Holdings Berhad (2 May 2003 - current)-        Non-Executive Chairman, SIRIM Berhad (20 May 2015 - current)-        Director, Tazaki Holdings Sdn. Bhd. (9 December 2000 - current)-         President, Academy of Sciences Malaysia (28 December 2010 - 27 December 2016)-         Chairman, UEM Group Berhad (1 April 2007 - 31 December 2017) & Chairman of the Executive Committee         (1 April 2009 - 6 July 2009) & (10 October 2012 - 16 November 2012)-         Independent Non-Executive Chairman, Zelan Berhad (27 July 2004 - 1 April 2007)-        Chairman, Zelan Holdings (M) Sdn Bhd (22 April 2004 - 31 March 2007)-        President, Malaysia University of Science and Technology (October 2002 - March 2004)-         Chairman, Gas Malaysia Berhad (February 2001 - August 2004)-        Chairman/Chief Executive, Tenaga Nasional Berhad (1 September 1996 - 31 August 2000)-        Director-General, Standards and Industrial Research Institute of Malaysia (1989 - 1996)-        Deputy Director General, Nuclear Energy Unit, Prime Minister's Department, Malaysia (1988 - 1989)-        Field Expert, International Atomic Energy Agency (1985 - 1988)-        Deputy Director (Operations), Tun Ismail Atomic Research Centre (PUSPATI) (1983 - 1985)-        Senior Research Officer, PUSPATI (1977 - 1982)-        Assistant Engineer, National Electricity Board, Malaya (1973 - 1977)
Directorships in public companies and listed issuers (if any)
Public Listed Company:Optimax Holdings Berhad Public Companiesinde Malaysia Holdings Berhad SIRIM Berhad
Family relationship with any director and/or major shareholder of the listed issuer
None
Any conflict of interests that he/she has with the listed issuer
None
Details of any interest in the securities of the listed issuer or its subsidiaries
50,000 ordinary shares of Malakoff Corporation Berhad

回复

使用道具 举报

您需要登录后才可以回帖 登录 | 注册

本版积分规则

 

ADVERTISEMENT


本周最热论坛帖子本周最热论坛帖子

ADVERTISEMENT



ADVERTISEMENT

ADVERTISEMENT


版权所有 © 1996-2023 Cari Internet Sdn Bhd (483575-W)|IPSERVERONE 提供云主机|广告刊登|关于我们|私隐权|免控|投诉|联络|脸书|佳礼资讯网

GMT+8, 31-7-2025 04:18 AM , Processed in 0.164858 second(s), 22 queries , Gzip On.

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表