佳礼资讯网

 找回密码
 注册

ADVERTISEMENT

楼主: jason8reading8

【SAPNRG 5218 交流专区】(前名 SENERGY)

  [复制链接]
发表于 12-7-2020 11:29 AM | 显示全部楼层
在0.095买入500 lot等着小刀砍大树
回复

使用道具 举报


ADVERTISEMENT

发表于 22-7-2020 08:44 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
SAPURA ENERGY BERHAD - AWARD OF CONTRACTS
INTRODUCTION
Sapura Energy Berhad ("Sapura Energy" or the “Company") is pleased to announce that its wholly-owned subsidiaries in Engineering and Construction (E&C) have been awarded several contracts with a combined value of approximately RM766 million.

Details of each of these contracts (“Contracts”) are as summarised below:

Brunei
CONTRACT FOR PRP7 PIPELINE REPLACEMENT PROJECT FROM BRUNEI SHELL PETROLEUM CO. SDN BHD
Sapura Offshore Sdn Bhd has been awarded with a contract for PRP7 Pipeline Replacement Project by Brunei Shell Petroleum Co. Sdn Bhd.
The contract scope of work comprises of the base scope of replacement of 16” x 9.4km pipeline PID1494 including topside modification, riser and pipeline demolition, as well as optional scope of replacement of 6” x 1.0km pipeline PID2008 including topside modification, riser and pipeline demolition.
The works are expected to be completed by Q1 FY2022.

Singapore
CONTRACT FOR THE ENGINEERING, PROCUREMENT, CONSTRUCTION AND INSTALLATION FOR THE SBM PIPELINE REJUVENATION PHASE II PROJECT BY SHELL EASTERN PETROLEUM (PTE) LTD
Sapura Offshore Sdn Bhd Singapore Branch has been awarded together with its consortium partner Dredging International Asia Pacific, the Engineering, Procurement, Construction and Installation contract for the Single Buoy Mooring (SBM) Pipeline Rejuvenation Phase II Project by Shell Eastern Petroleum (Pte) Ltd.
The contract scope of work comprises a pre-emptive repair of the nearshore pipeline section, rejuvenate the SBM system and optional removal of existing pipeline to ensure fitness for service of the crude offloading system to Bukom Refinery at Singapore.
The works are expected to be completed by Q3 FY2023.

Thailand
CONTRACT FOR ASSET RETIREMENT OFFSHORE REMOVAL CAMPAIGN FROM CHEVRON THAILAND EXPLORATION AND PRODUCTION, LTD
Sapura Energy (Thailand) Limited has received an award for the provision of project management, engineering, procurement, offshore heavy lifting vessel and transportation spread to execute the work for Asset Retirement Offshore Removal Campaign (“Contract”)  in Thailand from Chevron Thailand Exploration and Production, Ltd.
The Contract scope of work comprises of project management, engineering, procurement, offshore heavy lifting vessel and transportation spread to decommission seven offshore jackets, wet tow and reef jacket at reef site.
The offshore campaign is expected to commence within FY2021.

Malaysia
CONTRACT FOR PAN MALAYSIA TRANSPORTATION & INSTALLATION OF OFFSHORE FACILITIES BY HESS E&P MALAYSIA
Sapura Offshore Sdn Bhd has received an award for Pan Malaysia Transportation & Installation of Offshore Facilities from Hess Exploration and Production Malaysia B.V pursuant to the Umbrella Contract for the Pan Malaysia Transportation and Installation of Offshore Facilities (2017-2020).
The contract scope of work comprises of the provision of project management, installation engineering, transportation and installation of the following at Bergading Central Processing Platform:
  • Gas Module and Support Frame
  • Condensate Module and Support Frame
  • Shutdown Valve Platform
The works are expected to be completed by Q4 FY2021.

Malaysia - Thailand
CONTRACT FOR ADDITIONAL ANDALAS PIPELINE PROJECT PHASE 4 DEVELOPMENT FROM CARIGALI-PTTEPI OPERATING COMPANY SDN BHD
Sapura Offshore Sdn Bhd has received an award for the provision of engineering, procurement, construction and installation service for Additional Andalas Pipeline Project Phase 4 Development (“Contract”) in The Malaysia-Thailand Joint Development Area (MTJDA) from Carigali-PTTEPI Operating Company Sdn Bhd.
The Contract scope of work comprises of engineering, procurement, construction, installation and pre-commissioning of 20” x 29km subsea pipeline from ADB to JKA platforms, including riser and riser guard installation.
The effective date of the Contract is 30th April 2020 and the works are scheduled to be completed within 15 months.

FINANCIAL EFFECTS
The Contracts announced herein will have no effect on the issued capital of the Company and are expected to contribute positively towards the earnings of Sapura Energy and its subsidiaries (“the Group”) for the financial year ending 31 January 2021 and the financial period thereafter within the duration of the Contracts period.

RISK FACTORS
Risk factors affecting the Contracts including execution risks such as availability of skilled manpower and materials, changes in pricing, weather conditions and/or political, economic and regulatory conditions. Notwithstanding, the Group has established a successful track record undertaking similar projects.

DIRECTORS’ AND MAJOR SHAREHOLDERS’ INTERESTS
None of the Directors and/or major shareholders of the Company and/or persons connected with them have any direct or indirect interest in the award of the Contracts herein.

DIRECTORS’ STATEMENT
The Board is of the opinion that the acceptance of the Contracts is in the best interest of the Company.

This announcement is dated 3 June 2020.           
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3055758

回复

使用道具 举报

发表于 28-7-2020 07:55 PM | 显示全部楼层
回复

使用道具 举报

发表于 20-8-2020 09:05 AM | 显示全部楼层
SAPURA ENERGY BERHAD

Date of change
16 Jun 2020
Name
TAN SRI DATUK AMAR DR TOMMY BIN BUGO @ HAMID BIN BUGO
Age
74
Gender
Male
Nationality
Malaysia
Type of change
Redesignation
Previous Position
Director
New Position
Chairman
Directorate
Independent and Non Executive

回复

使用道具 举报

发表于 22-8-2020 08:25 AM | 显示全部楼层
SAPURA ENERGY BERHAD

Date of change
15 Jun 2020
Name
MR ABDUL JALIL BIN ABDUL RASHEED
Age
37
Gender
Male
Nationality
Malaysia
Designation
Chairman
Directorate
Non Independent and Non Executive
Type of change
Resignation
Reason
Stepping down from his position as President & Group Chief Executive of Permodalan Nasional Berhad.

回复

使用道具 举报

发表于 18-9-2020 07:44 PM | 显示全部楼层
本帖最后由 icy97 于 17-1-2021 08:31 AM 编辑


Type
Announcement
Subject
OTHERS
Description
SAPURA ENERGY BERHAD  AWARD OF CONTRACTS
INTRODUCTION
Sapura Energy Berhad (“Sapura Energy" or the “Company”) is pleased to announce that its wholly-owned subsidiaries and joint venture have been awarded contracts/contract extensions with a combined value of approximately RM840 million.
Details of each of these contracts/contract extensions (collectively referred to as “Contracts”) are as summarised below:

Engineering & Construction:

Mexico
AWARD OF CONTRACT FOR ENGINEERING, PROCUREMENT, CONSTRUCTION AND INSTALLATION OF AMOCA PLATFORM BY ENI MEXICO S. DE R. L. DE C.V.
Sapura Energy Mexicana S.A.P.I. de C.V. has been awarded a contract for the engineering, procurement, construction and installation for the Eni Mexico S. de R. L. de C.V. Amoca Project – Offshore Block Area 1 in Mexico.
The contract scope of work comprises the transportation and installation of Amoca Platform and the pipeline and subsea cable scope of work interconnecting the Amoca and Mizton platforms and Floating Production Storage and Offloading (FPSO).
The works are expected to be completed by Q4 FY2022.

Brazil
EXTENSION OF CONTRACT FOR THE CHARTER AND OPERATIONS OF PIPE LAYING SUPPORT VESSEL “SAPURA ESMERALDA” FROM PETROLEO BRASILEIRO S.A. (“PETROBRAS”)
Sapura Navegação Marítima S.A., a wholly-owned subsidiary of Seabras Sapura Participações S.A., a joint venture company between Sapura Offshore Sdn Bhd and Seabras Serviços De Petroleo S.A., a subsidiary of Seadrill Limited, has been awarded with twelve (12) months extension for the charter and service contracts respectively by Petrobras in Brazil.
The contract scope of work comprises the provision of services and charter for installation and recovery of flexible pipes, by utilizing Sapura Esmeralda in the Brazilian waters. Sapura Esmeralda shall perform all operations required for the installation of the flexible pipes, electric-hydraulic umbilical and power cables, new or used, such as loading, unloading, laying, connection between spans, vertical connection (first and second end) on submarine equipment, installation of submarine equipment and hydrostatic test, in a maximum water depth of 2500 meters.
The existing contract is expected to complete by April 2021 and the twelve (12) months extension will commence immediately after the duration of the original contract of Sapura Esmeralda ends.

Drilling:

Ivory Coast
AWARD OF CONTRACT FOR TENDER ASSIST DRILLING RIG “SAPURA BERANI” BY FOXTROT INTERNATIONAL LDC.
Sapura Drilling Holdings Limited has been awarded a contract for the provision of its Tender Assist Drilling Rig “Sapura Berani” services by Foxtrot International LDC.
The contract scope comprises the provision of semi tender-assist drilling rig services for 3 wells commencing in Q1 FY2022 for a period of 9 months offshore Ivory Coast plus one option of one well extension.

FINANCIAL EFFECTS
The Contracts announced herein will have no effect on the issued capital of the Company and is expected to contribute positively towards the earnings of Sapura Energy Berhad and its subsidiaries (“the Group”) for the financial year ending 31 January 2021 and the financial period thereafter within the duration of the Contracts period.

RISK FACTORS
Risk factors affecting the Contracts include execution risks such as availability of skilled manpower and materials, changes in pricing, weather conditions and/or political, economic, operational and commercial impacts of COVID-19 and regulatory conditions. Notwithstanding, the Group has established a successful track record undertaking similar projects.

DIRECTORS’ AND MAJOR SHAREHOLDERS’ INTERESTS
None of the Directors and/or major shareholders of the Company and/or persons connected with them have any direct or indirect interest in the award of the Contracts herein.

DIRECTOR’S STATEMENT
The Board is of the opinion that the acceptance of the Contracts is in the best interest of the Company.

This announcement is dated 17 September 2020.
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3088669


SUMMARY OF KEY FINANCIAL INFORMATION
31 Jul 2020
INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
31 Jul 2020
31 Jul 2019
31 Jul 2020
31 Jul 2019
$$'000
$$'000
$$'000
$$'000
1Revenue
1,219,237
1,927,400
2,575,899
3,559,860
2Profit/(loss) before tax
53,377
-93,226
89,568
-171,580
3Profit/(loss) for the period
23,651
-116,557
37,559
-225,884
4Profit/(loss) attributable to ordinary equity holders of the parent
23,744
-116,312
37,951
-225,407
5Basic earnings/(loss) per share (Subunit)
0.15
-0.73
0.24
-1.41
6Proposed/Declared dividend per share (Subunit)
0.00
0.00
0.00
0.00


AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent ($$)
0.5900
0.5700




https://www.theedgemarkets.com/a ... rofit-rm237m-2qfy21
回复

使用道具 举报

Follow Us
发表于 4-10-2020 08:39 AM | 显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
30 Apr 2020
INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
30 Apr 2020
30 Apr 2019
30 Apr 2020
30 Apr 2019
$$'000
$$'000
$$'000
$$'000
1Revenue
1,356,662
1,632,460
1,356,662
1,632,460
2Profit/(loss) before tax
36,191
-78,354
36,191
-78,354
3Profit/(loss) for the period
13,908
-109,327
13,908
-109,327
4Profit/(loss) attributable to ordinary equity holders of the parent
14,207
-109,096
14,207
-109,096
5Basic earnings/(loss) per share (Subunit)
0.09
-0.68
0.09
-0.68
6Proposed/Declared dividend per share (Subunit)
0.00
0.00
0.00
0.00


AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent ($$)
0.6000
0.5700

回复

使用道具 举报

发表于 22-11-2020 09:58 AM | 显示全部楼层
本帖最后由 icy97 于 12-1-2021 06:53 AM 编辑

SAPURA ENERGY BERHAD

Date of change
30 Jul 2020
Name
TAN SRI DATUK AMAR DR TOMMY BIN BUGO @ HAMID BIN BUGO
Age
74
Gender
Male
Nationality
Malaysia
Designation
Chairman
Directorate
Independent and Non Executive
Type of change
Resignation
Reason
Limitation of 6 years Board tenure as imposed by the major shareholder




Date of change
30 Jul 2020
Name
TAN SRI DATO' SERI SHAMSUL AZHAR BIN ABBAS
Age
68
Gender
Male
Nationality
Malaysia
Designation
Chairman
Directorate
Non Independent and Non Executive
Type of change
Appointment
Qualifications
No
Qualifications
Major/Field of Study
Institute/University
Additional Information
1
Masters
Energy Management
University of Pennsylvania, United States of America
2
Degree
Social Science (Political Science)
Universiti Sains Malaysia
3
Diploma
Petroleum Economics
Institut Francaise du Petrole, France

Working experience and occupation
Tan Sri Dato' Seri Shamsul Azhar bin Abbas served Petroliam Nasional Berhad (PETRONAS) for forty years in various capacities and key positions, including his last held position as the President & Chief Executive Officer of PETRONAS from 2010 to 2015, prior to his appointment as the Group Chairman of MMC Corporation Berhad on 16 July 2015. He was also the President/Chief Executive Officer of MISC Berhad from July 2004 to December 2008 and Chairman of MISC Berhad from February 2010 to August 2011. Tan Sri Dato' Seri Shamsul Azhar was the Pro-Chancellor of Universiti Teknologi Petronas (UTP) and was a member of Board of Trustees of  Razak School of Government (RSOG). He also served as the Chairman of the National Trust Fund of Malaysia.He is also currently a Board member of Enra Group Berhad and NCB Holdings Berhad.
Directorships in public companies and listed issuers (if any)
1. Sapura Energy Berhad2. MMC Corporation Berhad3. Enra Group Berhad4. NCB Holdings Berhad
Family relationship with any director and/or major shareholder of the listed issuer
Nil
Any conflict of interests that he/she has with the listed issuer
Nil
Details of any interest in the securities of the listed issuer or its subsidiaries
Sapura Energy Berhad   Direct: 2,455,000 Ordinary Shares (0.015%)Indirect: 3,779,400 Ordinary Shares (0.024%)
回复

使用道具 举报


ADVERTISEMENT

发表于 31-12-2020 09:35 AM | 显示全部楼层
本帖最后由 icy97 于 9-1-2021 05:22 AM 编辑

SAPURA ENERGY BERHAD

Date of change
27 Aug 2020
Name
TAN SRI DATO' MEGAT ZAHARUDDIN BIN MEGAT MOHD NOR
Age
71
Gender
Male
Nationality
Malaysia
Designation
Director
Directorate
Independent and Non Executive
Type of change
Appointment
Qualifications
No
Qualifications
Major/Field of Study
Institute/University
Additional Information
1
Degree
BSc (Hons) in Mining Engineering
Imperial College of Science & Technology, London University

Working experience and occupation
Tan Sri Dato' Megat Zaharuddin was the Chairman of Federal Land Development Authority (Felda) from 27 July 2018 to 30 June 2019.Prior to that he was appointed as Director from July 2004 to February 2009 and Chairman of Maybank from 1 October 2009 to 31 March 2017. He built an outstanding career in the oil and gas industry for 31 years with the Royal Dutch Shell Group of Companies and was the Regional Business Chief Executive Officer and Managing Director, Shell Exploration and Production B.V. prior to his retirement in early 2004.He was also the Chairman of Maxis Communications Berhad from 2004 to 2007, Etiqa Insurance & Takaful from January 2006 until February 2009, Malaysian Rubber Board from February 2009 to May 2010, Maybank Investment Bank Berhad from January 2010 until March 2016, PADU (Education Performance and Delivery Unit) from August 2013 until September 2016, Director of the Capital Market Development Fund from January 2004 to January 2010 and Director of Woodside Petroleum Ltd, a company listed on the Australian Securities Exchange, from December 2007 to April 2011.
Directorships in public companies and listed issuers (if any)
Nil
Family relationship with any director and/or major shareholder of the listed issuer
Nil
Any conflict of interests that he/she has with the listed issuer
Nil
Details of any interest in the securities of the listed issuer or its subsidiaries
Sapura Energy Berhad  Direct: 9,786 Ordinary Shares Indirect: 12,570 Ordinary Shares

回复

使用道具 举报

发表于 19-1-2021 07:08 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
SAPURA ENERGY BERHAD ANNOUNCES LEADERSHIP SUCCESSION PLAN
We are pleased to attach herewith a press release dated 21 September 2020 titled, "Sapura Energy Berhad Announces Leadership Succession Plan".

This announcement is dated 21 September 2020.
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3089628

回复

使用道具 举报

发表于 22-1-2021 09:24 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
SAPURA ENERGY BERHAD - MEDIA STATEMENT IN RESPONSE TO INVESTIGATIONS IN BRAZIL
We are pleased to attach herewith a press release dated 24 September 2020 titled, "Media Statement in Response to Investigations in Brazil".

This announcement is dated 24 September 2020.
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3090475

回复

使用道具 举报

发表于 15-2-2021 07:45 AM | 显示全部楼层
SAPURA ENERGY BERHAD

Date of change
01 Oct 2020
Name
DATUK MOHD ANUAR BIN TAIB
Age
52
Gender
Male
Nationality
Malaysia
Designation
Director
Directorate
Independent and Non Executive
Type of change
Resignation
Reason
Appointed as Chief Operating Officer and CEO Designate effective 1 October 2020.

回复

使用道具 举报

发表于 25-2-2021 08:12 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
SAPURA ENERGY BERHAD - MEDIA STATEMENT IN FURTHER RESPONSE TO INVESTIGATIONS IN BRAZIL
We are pleased to attach herewith a press release dated 7 October 2020 titled, "Media Statement in Further Response to Investigations in Brazil".

This announcement is dated 7 October 2020.
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3094341

回复

使用道具 举报

发表于 20-5-2021 09:08 AM | 显示全部楼层
本帖最后由 icy97 于 4-8-2021 07:29 AM 编辑

Type
Announcement
Subject
OTHERS
Description
SAPURA ENERGY BERHAD  AWARD OF CONTRACTS
INTRODUCTION
Sapura Energy Berhad (“Sapura Energy" or the “Company”) is pleased to announce that its wholly-owned subsidiaries in Engineering and Construction (E&C) and Drilling have been awarded several contracts with a combined value of approximately RM611 million.
Details of each contract (“Contracts”) are as summarised below:

Engineering & Construction:
Qatar
AWARD OF CONTRACT FOR THE PROVISION OF ENGINEERING, PROCUREMENT, SUPPLY, CONSTRUCTION, INSTALLATION AND PRE-COMMISSIONING OF PIPELINES IN AL-KHALIJ FIELD FROM TOTAL E&P GOLFE LIMITED
Sapura Fabrication Sdn Bhd - Qatar Branch has been awarded a contract for the provision of engineering, procurement, supply, construction, installation and pre-commissioning of 2 Nos 16” pipelines in Al-Khalij Field, Block 6 in Qatar by Total E&P Golfe Limited.
The scope of work for this contract includes the engineering, procurement, supply, fabrication, construction, installation and pre-commissioning of 2 Nos 16” pipelines made of pipes lined with corrosion resistant alloy, between DP4 & DP3 and DP3 & DP2 platforms. The Al-Khalij field is located offshore Qatar approximately 110 km east of the mainland coast and approximately 40 km North East of Halul Island. The average water depth in the field is 59 m.
The works are expected to be completed by Q2 FY2022.

Malaysia - Thailand
AWARD OF CONTRACT FOR THE PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION, TRANSPORTATION & INSTALLATION AND HOOK-UP & COMMISSIONING FOR ADDITIONAL ANDALAS PIPELINE PROJECT PHASE 4 DEVELOPMENT BY CARIGALI-PTTEPI OPERATING COMPANY SDN BHD
Sapura Fabrication Sdn Bhd has received an award for the provision of engineering, procurement, construction, transportation and installation as well as hook up and commissioning of Host Tie-In And Brownfield Modification Work For Additional Andalas Pipeline Project For Phase 4 Development in the Malaysia-Thailand Joint Development Area (MTJDA) from Carigali-PTTEPI Operating Company Sdn Bhd.
The contract scope of work comprises of engineering, procurement, onshore construction, transportation and marine spread chartering, as well as offshore hook up and commissioning of Host Tie-In and Brownfield Modification at Jengka-A Wellhead Platform, Andalas-B Wellhead Platform, and MUDA Central Processing Platforms.
The works are expected to be completed by Q3 FY2022.

Drilling:
Congo
AWARD OF CONTRACT FOR TENDER ASSIST DRILLING RIG “SAPURA BERANI” BY TOTAL EXPLORATION & PRODUCTION CONGO.
Sapura Drilling Holdings Limited, has been awarded a contract by Total Exploration and Production Congo for the provision of its Tender Assist Drilling Rig “Sapura Berani” services.
The scope of the contract comprises the provision of semi tender-assist drilling rig services for 3 wells commencing in Q4 FY2021 for a period of 3 months offshore Congo plus one option of one well extension.

FINANCIAL EFFECTS
The Contracts announced herein will have no effect on the issued capital of the Company and is expected to contribute positively towards the earnings of Sapura Energy Berhad and its subsidiaries (“the Group”) for the financial year ending 31 January 2021 and the financial period thereafter within the duration of the Contracts period.

RISK FACTORS
Risk factors affecting the Contracts including execution risks such as availability of skilled manpower and materials, changes in pricing, weather conditions and/or political, economic, operational and commercial impacts of COVID-19 and regulatory conditions. Notwithstanding, the Group has established a successful track record undertaking similar projects.

DIRECTORS’ AND MAJOR SHAREHOLDERS’ INTERESTS
None of the Directors and/or major shareholders of the Company and/or persons connected with them have any direct or indirect interest in the award of the Contracts herein.

DIRECTOR’S STATEMENT
The Board is of the opinion that the acceptance of the Contracts is in the best interest of the Company.

This announcement is dated 16 November 2020.
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3105157



Type
Announcement
Subject
OTHERS
Description
SAPURA ENERGY BERHAD  - AWARD OF CONTRACTS
Further to our annuncement dated 16 November 2020 in relation to the award of contracts, we attach herewith the amended media release titled "Sapura Energy Secures Al-Khalij Pipeline Project Among RM611 Million New Contract Wins"

This announcement is dated 17 November 2020.
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3105761



SUMMARY OF KEY FINANCIAL INFORMATION
31 Oct 2020
INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
31 Oct 2020
31 Oct 2019
31 Oct 2020
31 Oct 2019
$$'000
$$'000
$$'000
$$'000
1Revenue
1,328,379
1,777,401
3,904,278
5,337,260
2Profit/(loss) before tax
58,983
-113,237
148,551
-284,818
3Profit/(loss) for the period
17,502
-101,968
55,061
-327,853
4Profit/(loss) attributable to ordinary equity holders of the parent
17,205
-100,891
55,156
-326,299
5Basic earnings/(loss) per share (Subunit)
0.11
-0.63
0.35
-2.05
6Proposed/Declared dividend per share (Subunit)
0.00
0.00
0.00
0.00


AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent ($$)
0.5800
0.5700

回复

使用道具 举报

发表于 27-2-2022 08:13 AM | 显示全部楼层
SAPURA ENERGY BERHAD

Date of change
01 Dec 2021
Name
MR CHEW SENG HENG
Age
55
Gender
Male
Nationality
Malaysia
Type of change
Appointment
Designation
Chief Financial Officer
Qualifications
No
Qualifications
Major/Field of Study
Institute/University
Additional Information
1
Degree
Accounting
University of Malaya
2
Professional Qualification
Chartered Accountant
Malaysia Institute of Accountants
  
Working experience and occupation
A senior finance professional with 30 years of broad experience in the energy sector working for Royal Dutch Shell Group. He started his career in 1991 with Shell companies in Malaysia and held the Finance Director position before moving to the Group head-office in 2013 based in The Hague for 7 years as the Head of Reporting. Prior to moving to The Hague, he held both country and regional roles responsible for Malaysia, Singapore, Brunei, the Philippines, Thailand, China, India, New Zealand and Australia. He joined Sapura Energy Berhad as Vice President, Group Controller in April 2021. He assumed the role of Acting Group Chief Financial Officer of Sapura Energy Berhad on 1 October 2021.
Directorships in public companies and listed issuers (if any)
Nil
Family relationship with any director and/or major shareholder of the listed issuer
Nil
Any conflict of interests that he/she has with the listed issuer
Nil
Details of any interest in the securities of the listed issuer or its subsidiaries
Sapura Energy BerhadDirect: 1,370 Ordinary Shares

回复

使用道具 举报

发表于 1-3-2022 08:32 AM | 显示全部楼层
SAPURA ENERGY BERHAD

Type
Announcement
Subject
OTHERS
Description
Sapura Energy Berhad - Sapura Energy Clarifies News Reports
We are pleased to attach herewith a press release dated 8 December 2021 titled, "Sapura Energy Clarifies News Reports".

This announcement is dated 8 December 2021.
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3217160

回复

使用道具 举报


ADVERTISEMENT

发表于 5-3-2022 09:24 AM | 显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
31 Oct 2021
INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
31 Oct 2021
31 Oct 2020
31 Oct 2021
31 Oct 2020
$$'000
$$'000
$$'000
$$'000
1Revenue
1,445,920
1,328,379
3,673,629
3,904,278
2Profit/(loss) before tax
-649,169
58,983
-2,183,209
148,551
3Profit/(loss) for the period
-668,104
17,502
-2,282,274
55,061
4Profit/(loss) attributable to ordinary equity holders of the parent
-669,342
17,205
-2,283,307
55,156
5Basic earnings/(loss) per share (Subunit)
-4.19
0.11
-14.30
0.35
6Proposed/Declared dividend per share (Subunit)
0.00
0.00
0.00
0.00


AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent ($$)
0.4300
0.5600

回复

使用道具 举报

发表于 6-9-2022 08:29 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
SAPURA ENERGY BERHADASSISTANCE TO MEDIATE BY THE CORPORATE DEBT RESTRUCTURING COMMITTEE OF BANK NEGARA MALAYSIA
The Board of Directors of Sapura Energy Berhad (“SEB”) wishes to announce that the Corporate Debt Restructuring Committee of Malaysia (“CDRC”), a committee under the purview of Bank Negara Malaysia (“BNM”), has on 1 September 2022 accepted SEB’s application for assistance to mediate in the debt restructuring negotiations with its MCF Financiers (“Lenders”), being certain financial institutions who have provided multicurrency facilities to Sapura TMC Sdn. Bhd., under:
  • the senior multicurrency term facilities agreement dated 29 March 2021 between, inter alia, Sapura TMC Sdn. Bhd. as borrower, and the banks named therein as conventional facility lenders; and/or
  • the multicurrency sukuk programme of up to RM10 billion in nominal value based on the Shariah principle of murabahah (via a tawarruq arrangement), established under a programme agreement originally dated 20 August 2015 between Sapura TMC Sdn. Bhd. as issuer, Maybank Investment Bank Berhad as lead arranger, and Maybank Investment Bank Berhad as facility agent, and as thereafter amended and supplemented.

SEB and nine of its subsidiaries, who are obligors to the MCF Financiers, which are listed in the Appendix 1 (“Admitted Group Companies”), were admitted with effect from that date.

Following the CDRC’s acceptance of SEB’s application, CDRC has issued a letter addressed to:
  • SEB and its Lenders whereby  the Lenders are expected to observe an informal standstill and withhold from any proceedings and SEB is expected to submit a proposal for a restructuring of its debts within 60 days from 1 September 2022; and
  • SEB where SEB and the Admitted Group Companies are required to adhere to and be bound by Bank Negara Malaysia CDRC Participant’s Code of Conduct (“Code”) and any variations thereof as determined at the discretion of the CDRC from time to time.

The operations of the SEB Group shall continue as usual in the interim.

Further announcements will be made as and when appropriate.

This announcement is dated 5 September 2022.
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3289832
Attachments

回复

使用道具 举报

发表于 12-9-2022 10:34 AM | 显示全部楼层
Type
Announcement
Subject
OTHERS
Description
MEDIA RELEASE- SAPURA PROJECT SERVICES APPOINTS INTERIM LIQUIDATOR
We are pleased to attach herewith a media release dated 9 September 2022 titled, "Sapura Project Services Appoints Interim Liquidator".

This announcement is dated 9 September 2022.
https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3291180

回复

使用道具 举报

发表于 27-9-2022 11:46 AM | 显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
31 Jul 2022
INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
31 Jul 2022
31 Jul 2021
31 Jul 2022
31 Jul 2021
$$'000
$$'000
$$'000
$$'000
1Revenue
1,172,878
747,115
2,058,959
2,217,709
2Profit/(loss) before tax
25,188
-1,470,030
121,990
-1,534,040
3Profit/(loss) for the period
-1,736
-1,511,968
85,656
-1,614,170
4Profit/(loss) attributable to ordinary equity holders of the parent
-2,592
-1,516,891
89,342
-1,613,965
5Basic earnings/(loss) per share (Subunit)
-0.02
-9.50
0.56
-10.11
6Proposed/Declared dividend per share (Subunit)
0.00
0.00
0.00
0.00


AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent ($$)
0.0100
0.0100

回复

使用道具 举报

您需要登录后才可以回帖 登录 | 注册

本版积分规则

 

ADVERTISEMENT



ADVERTISEMENT



ADVERTISEMENT

ADVERTISEMENT


版权所有 © 1996-2023 Cari Internet Sdn Bhd (483575-W)|IPSERVERONE 提供云主机|广告刊登|关于我们|私隐权|免控|投诉|联络|脸书|佳礼资讯网

GMT+8, 26-5-2024 07:51 AM , Processed in 0.063509 second(s), 22 queries , Gzip On.

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表