Type | Announcement | Subject | OTHERS | Description | SAPURA ENERGY BERHAD - AWARD OF CONTRACTS | INTRODUCTION Sapura Energy Berhad ("Sapura Energy" or the “Company") is pleased to announce that its wholly-owned subsidiaries in Engineering and Construction (E&C) have been awarded several contracts with a combined value of approximately RM766 million.
Details of each of these contracts (“Contracts”) are as summarised below:
Brunei CONTRACT FOR PRP7 PIPELINE REPLACEMENT PROJECT FROM BRUNEI SHELL PETROLEUM CO. SDN BHD Sapura Offshore Sdn Bhd has been awarded with a contract for PRP7 Pipeline Replacement Project by Brunei Shell Petroleum Co. Sdn Bhd. The contract scope of work comprises of the base scope of replacement of 16” x 9.4km pipeline PID1494 including topside modification, riser and pipeline demolition, as well as optional scope of replacement of 6” x 1.0km pipeline PID2008 including topside modification, riser and pipeline demolition. The works are expected to be completed by Q1 FY2022.
Singapore CONTRACT FOR THE ENGINEERING, PROCUREMENT, CONSTRUCTION AND INSTALLATION FOR THE SBM PIPELINE REJUVENATION PHASE II PROJECT BY SHELL EASTERN PETROLEUM (PTE) LTD Sapura Offshore Sdn Bhd Singapore Branch has been awarded together with its consortium partner Dredging International Asia Pacific, the Engineering, Procurement, Construction and Installation contract for the Single Buoy Mooring (SBM) Pipeline Rejuvenation Phase II Project by Shell Eastern Petroleum (Pte) Ltd. The contract scope of work comprises a pre-emptive repair of the nearshore pipeline section, rejuvenate the SBM system and optional removal of existing pipeline to ensure fitness for service of the crude offloading system to Bukom Refinery at Singapore. The works are expected to be completed by Q3 FY2023.
Thailand CONTRACT FOR ASSET RETIREMENT OFFSHORE REMOVAL CAMPAIGN FROM CHEVRON THAILAND EXPLORATION AND PRODUCTION, LTD Sapura Energy (Thailand) Limited has received an award for the provision of project management, engineering, procurement, offshore heavy lifting vessel and transportation spread to execute the work for Asset Retirement Offshore Removal Campaign (“Contract”) in Thailand from Chevron Thailand Exploration and Production, Ltd. The Contract scope of work comprises of project management, engineering, procurement, offshore heavy lifting vessel and transportation spread to decommission seven offshore jackets, wet tow and reef jacket at reef site. The offshore campaign is expected to commence within FY2021.
Malaysia CONTRACT FOR PAN MALAYSIA TRANSPORTATION & INSTALLATION OF OFFSHORE FACILITIES BY HESS E&P MALAYSIA Sapura Offshore Sdn Bhd has received an award for Pan Malaysia Transportation & Installation of Offshore Facilities from Hess Exploration and Production Malaysia B.V pursuant to the Umbrella Contract for the Pan Malaysia Transportation and Installation of Offshore Facilities (2017-2020). The contract scope of work comprises of the provision of project management, installation engineering, transportation and installation of the following at Bergading Central Processing Platform: - Gas Module and Support Frame
- Condensate Module and Support Frame
- Shutdown Valve Platform
The works are expected to be completed by Q4 FY2021.
Malaysia - Thailand CONTRACT FOR ADDITIONAL ANDALAS PIPELINE PROJECT PHASE 4 DEVELOPMENT FROM CARIGALI-PTTEPI OPERATING COMPANY SDN BHD Sapura Offshore Sdn Bhd has received an award for the provision of engineering, procurement, construction and installation service for Additional Andalas Pipeline Project Phase 4 Development (“Contract”) in The Malaysia-Thailand Joint Development Area (MTJDA) from Carigali-PTTEPI Operating Company Sdn Bhd. The Contract scope of work comprises of engineering, procurement, construction, installation and pre-commissioning of 20” x 29km subsea pipeline from ADB to JKA platforms, including riser and riser guard installation. The effective date of the Contract is 30th April 2020 and the works are scheduled to be completed within 15 months.
FINANCIAL EFFECTS The Contracts announced herein will have no effect on the issued capital of the Company and are expected to contribute positively towards the earnings of Sapura Energy and its subsidiaries (“the Group”) for the financial year ending 31 January 2021 and the financial period thereafter within the duration of the Contracts period.
RISK FACTORS Risk factors affecting the Contracts including execution risks such as availability of skilled manpower and materials, changes in pricing, weather conditions and/or political, economic and regulatory conditions. Notwithstanding, the Group has established a successful track record undertaking similar projects.
DIRECTORS’ AND MAJOR SHAREHOLDERS’ INTERESTS None of the Directors and/or major shareholders of the Company and/or persons connected with them have any direct or indirect interest in the award of the Contracts herein.
DIRECTORS’ STATEMENT The Board is of the opinion that the acceptance of the Contracts is in the best interest of the Company.
This announcement is dated 3 June 2020. | https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3055758
|
|
|
|
|
|
|
|
发表于 28-7-2020 07:55 PM
|
显示全部楼层
|
|
|
|
|
|
|
发表于 20-8-2020 09:05 AM
|
显示全部楼层
Date of change | 16 Jun 2020 | Name | TAN SRI DATUK AMAR DR TOMMY BIN BUGO @ HAMID BIN BUGO | Age | 74 | Gender | Male | Nationality | Malaysia | Type of change | Redesignation | Previous Position | Director | New Position | Chairman | Directorate | Independent and Non Executive |
|
|
|
|
|
|
|
|
发表于 22-8-2020 08:25 AM
|
显示全部楼层
Date of change | 15 Jun 2020 | Name | MR ABDUL JALIL BIN ABDUL RASHEED | Age | 37 | Gender | Male | Nationality | Malaysia | Designation | Chairman | Directorate | Non Independent and Non Executive | Type of change | Resignation | Reason | Stepping down from his position as President & Group Chief Executive of Permodalan Nasional Berhad. |
|
|
|
|
|
|
|
|
发表于 18-9-2020 07:44 PM
|
显示全部楼层
本帖最后由 icy97 于 17-1-2021 08:31 AM 编辑
Type | Announcement | Subject | OTHERS | Description | SAPURA ENERGY BERHAD AWARD OF CONTRACTS | INTRODUCTION Sapura Energy Berhad (“Sapura Energy" or the “Company”) is pleased to announce that its wholly-owned subsidiaries and joint venture have been awarded contracts/contract extensions with a combined value of approximately RM840 million. Details of each of these contracts/contract extensions (collectively referred to as “Contracts”) are as summarised below:
Engineering & Construction:
Mexico AWARD OF CONTRACT FOR ENGINEERING, PROCUREMENT, CONSTRUCTION AND INSTALLATION OF AMOCA PLATFORM BY ENI MEXICO S. DE R. L. DE C.V. Sapura Energy Mexicana S.A.P.I. de C.V. has been awarded a contract for the engineering, procurement, construction and installation for the Eni Mexico S. de R. L. de C.V. Amoca Project – Offshore Block Area 1 in Mexico. The contract scope of work comprises the transportation and installation of Amoca Platform and the pipeline and subsea cable scope of work interconnecting the Amoca and Mizton platforms and Floating Production Storage and Offloading (FPSO). The works are expected to be completed by Q4 FY2022.
Brazil EXTENSION OF CONTRACT FOR THE CHARTER AND OPERATIONS OF PIPE LAYING SUPPORT VESSEL “SAPURA ESMERALDA” FROM PETROLEO BRASILEIRO S.A. (“PETROBRAS”) Sapura Navegação Marítima S.A., a wholly-owned subsidiary of Seabras Sapura Participações S.A., a joint venture company between Sapura Offshore Sdn Bhd and Seabras Serviços De Petroleo S.A., a subsidiary of Seadrill Limited, has been awarded with twelve (12) months extension for the charter and service contracts respectively by Petrobras in Brazil. The contract scope of work comprises the provision of services and charter for installation and recovery of flexible pipes, by utilizing Sapura Esmeralda in the Brazilian waters. Sapura Esmeralda shall perform all operations required for the installation of the flexible pipes, electric-hydraulic umbilical and power cables, new or used, such as loading, unloading, laying, connection between spans, vertical connection (first and second end) on submarine equipment, installation of submarine equipment and hydrostatic test, in a maximum water depth of 2500 meters. The existing contract is expected to complete by April 2021 and the twelve (12) months extension will commence immediately after the duration of the original contract of Sapura Esmeralda ends.
Drilling:
Ivory Coast AWARD OF CONTRACT FOR TENDER ASSIST DRILLING RIG “SAPURA BERANI” BY FOXTROT INTERNATIONAL LDC. Sapura Drilling Holdings Limited has been awarded a contract for the provision of its Tender Assist Drilling Rig “Sapura Berani” services by Foxtrot International LDC. The contract scope comprises the provision of semi tender-assist drilling rig services for 3 wells commencing in Q1 FY2022 for a period of 9 months offshore Ivory Coast plus one option of one well extension.
FINANCIAL EFFECTS The Contracts announced herein will have no effect on the issued capital of the Company and is expected to contribute positively towards the earnings of Sapura Energy Berhad and its subsidiaries (“the Group”) for the financial year ending 31 January 2021 and the financial period thereafter within the duration of the Contracts period.
RISK FACTORS Risk factors affecting the Contracts include execution risks such as availability of skilled manpower and materials, changes in pricing, weather conditions and/or political, economic, operational and commercial impacts of COVID-19 and regulatory conditions. Notwithstanding, the Group has established a successful track record undertaking similar projects.
DIRECTORS’ AND MAJOR SHAREHOLDERS’ INTERESTS None of the Directors and/or major shareholders of the Company and/or persons connected with them have any direct or indirect interest in the award of the Contracts herein.
DIRECTOR’S STATEMENT The Board is of the opinion that the acceptance of the Contracts is in the best interest of the Company.
This announcement is dated 17 September 2020. | https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3088669
SUMMARY OF KEY FINANCIAL INFORMATION
31 Jul 2020 |
| INDIVIDUAL PERIOD | CUMULATIVE PERIOD | CURRENT YEAR QUARTER | PRECEDING YEAR
CORRESPONDING
QUARTER | CURRENT YEAR TO DATE | PRECEDING YEAR
CORRESPONDING
PERIOD | 31 Jul 2020 | 31 Jul 2019 | 31 Jul 2020 | 31 Jul 2019 | $$'000 | $$'000 | $$'000 | $$'000 |
1 | Revenue | 1,219,237 | 1,927,400 | 2,575,899 | 3,559,860 | 2 | Profit/(loss) before tax | 53,377 | -93,226 | 89,568 | -171,580 | 3 | Profit/(loss) for the period | 23,651 | -116,557 | 37,559 | -225,884 | 4 | Profit/(loss) attributable to ordinary equity holders of the parent | 23,744 | -116,312 | 37,951 | -225,407 | 5 | Basic earnings/(loss) per share (Subunit) | 0.15 | -0.73 | 0.24 | -1.41 | 6 | Proposed/Declared dividend per share (Subunit) | 0.00 | 0.00 | 0.00 | 0.00 |
|
| AS AT END OF CURRENT QUARTER | AS AT PRECEDING FINANCIAL YEAR END | 7
| Net assets per share attributable to ordinary equity holders of the parent ($$) | 0.5900 | 0.5700
|
https://www.theedgemarkets.com/a ... rofit-rm237m-2qfy21 |
|
|
|
|
|
|
|
发表于 4-10-2020 08:39 AM
|
显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
30 Apr 2020 |
| INDIVIDUAL PERIOD | CUMULATIVE PERIOD | CURRENT YEAR QUARTER | PRECEDING YEAR
CORRESPONDING
QUARTER | CURRENT YEAR TO DATE | PRECEDING YEAR
CORRESPONDING
PERIOD | 30 Apr 2020 | 30 Apr 2019 | 30 Apr 2020 | 30 Apr 2019 | $$'000 | $$'000 | $$'000 | $$'000 |
1 | Revenue | 1,356,662 | 1,632,460 | 1,356,662 | 1,632,460 | 2 | Profit/(loss) before tax | 36,191 | -78,354 | 36,191 | -78,354 | 3 | Profit/(loss) for the period | 13,908 | -109,327 | 13,908 | -109,327 | 4 | Profit/(loss) attributable to ordinary equity holders of the parent | 14,207 | -109,096 | 14,207 | -109,096 | 5 | Basic earnings/(loss) per share (Subunit) | 0.09 | -0.68 | 0.09 | -0.68 | 6 | Proposed/Declared dividend per share (Subunit) | 0.00 | 0.00 | 0.00 | 0.00 |
|
| AS AT END OF CURRENT QUARTER | AS AT PRECEDING FINANCIAL YEAR END | 7
| Net assets per share attributable to ordinary equity holders of the parent ($$) | 0.6000 | 0.5700
|
|
|
|
|
|
|
|
|
发表于 22-11-2020 09:58 AM
|
显示全部楼层
本帖最后由 icy97 于 12-1-2021 06:53 AM 编辑
Date of change | 30 Jul 2020 | Name | TAN SRI DATUK AMAR DR TOMMY BIN BUGO @ HAMID BIN BUGO | Age | 74 | Gender | Male | Nationality | Malaysia | Designation | Chairman | Directorate | Independent and Non Executive | Type of change | Resignation | Reason | Limitation of 6 years Board tenure as imposed by the major shareholder |
Date of change | 30 Jul 2020 | Name | TAN SRI DATO' SERI SHAMSUL AZHAR BIN ABBAS | Age | 68 | Gender | Male | Nationality | Malaysia | Designation | Chairman | Directorate | Non Independent and Non Executive | Type of change | Appointment | QualificationsNo | Qualifications | Major/Field of Study | Institute/University | Additional Information | 1 | Masters | Energy Management | University of Pennsylvania, United States of America | | 2 | Degree | Social Science (Political Science) | Universiti Sains Malaysia | | 3 | Diploma | Petroleum Economics | Institut Francaise du Petrole, France | |
Working experience and occupation | Tan Sri Dato' Seri Shamsul Azhar bin Abbas served Petroliam Nasional Berhad (PETRONAS) for forty years in various capacities and key positions, including his last held position as the President & Chief Executive Officer of PETRONAS from 2010 to 2015, prior to his appointment as the Group Chairman of MMC Corporation Berhad on 16 July 2015. He was also the President/Chief Executive Officer of MISC Berhad from July 2004 to December 2008 and Chairman of MISC Berhad from February 2010 to August 2011. Tan Sri Dato' Seri Shamsul Azhar was the Pro-Chancellor of Universiti Teknologi Petronas (UTP) and was a member of Board of Trustees of Razak School of Government (RSOG). He also served as the Chairman of the National Trust Fund of Malaysia.He is also currently a Board member of Enra Group Berhad and NCB Holdings Berhad. | Directorships in public companies and listed issuers (if any) | 1. Sapura Energy Berhad2. MMC Corporation Berhad3. Enra Group Berhad4. NCB Holdings Berhad | Family relationship with any director and/or major shareholder of the listed issuer | Nil | Any conflict of interests that he/she has with the listed issuer | Nil | Details of any interest in the securities of the listed issuer or its subsidiaries | Sapura Energy Berhad Direct: 2,455,000 Ordinary Shares (0.015%)Indirect: 3,779,400 Ordinary Shares (0.024%) |
|
|
|
|
|
|
|
|
发表于 31-12-2020 09:35 AM
|
显示全部楼层
本帖最后由 icy97 于 9-1-2021 05:22 AM 编辑
Date of change | 27 Aug 2020 | Name | TAN SRI DATO' MEGAT ZAHARUDDIN BIN MEGAT MOHD NOR | Age | 71 | Gender | Male | Nationality | Malaysia | Designation | Director | Directorate | Independent and Non Executive | Type of change | Appointment | QualificationsNo | Qualifications | Major/Field of Study | Institute/University | Additional Information | 1 | Degree | BSc (Hons) in Mining Engineering | Imperial College of Science & Technology, London University | |
Working experience and occupation | Tan Sri Dato' Megat Zaharuddin was the Chairman of Federal Land Development Authority (Felda) from 27 July 2018 to 30 June 2019.Prior to that he was appointed as Director from July 2004 to February 2009 and Chairman of Maybank from 1 October 2009 to 31 March 2017. He built an outstanding career in the oil and gas industry for 31 years with the Royal Dutch Shell Group of Companies and was the Regional Business Chief Executive Officer and Managing Director, Shell Exploration and Production B.V. prior to his retirement in early 2004.He was also the Chairman of Maxis Communications Berhad from 2004 to 2007, Etiqa Insurance & Takaful from January 2006 until February 2009, Malaysian Rubber Board from February 2009 to May 2010, Maybank Investment Bank Berhad from January 2010 until March 2016, PADU (Education Performance and Delivery Unit) from August 2013 until September 2016, Director of the Capital Market Development Fund from January 2004 to January 2010 and Director of Woodside Petroleum Ltd, a company listed on the Australian Securities Exchange, from December 2007 to April 2011. | Directorships in public companies and listed issuers (if any) | Nil | Family relationship with any director and/or major shareholder of the listed issuer | Nil | Any conflict of interests that he/she has with the listed issuer | Nil | Details of any interest in the securities of the listed issuer or its subsidiaries | Sapura Energy Berhad Direct: 9,786 Ordinary Shares Indirect: 12,570 Ordinary Shares |
|
|
|
|
|
|
|
|
发表于 19-1-2021 07:08 AM
|
显示全部楼层
|
|
|
|
|
|
|
发表于 22-1-2021 09:24 AM
|
显示全部楼层
|
|
|
|
|
|
|
发表于 15-2-2021 07:45 AM
|
显示全部楼层
Date of change | 01 Oct 2020 | Name | DATUK MOHD ANUAR BIN TAIB | Age | 52 | Gender | Male | Nationality | Malaysia | Designation | Director | Directorate | Independent and Non Executive | Type of change | Resignation | Reason | Appointed as Chief Operating Officer and CEO Designate effective 1 October 2020. |
|
|
|
|
|
|
|
|
发表于 25-2-2021 08:12 AM
|
显示全部楼层
|
|
|
|
|
|
|
发表于 20-5-2021 09:08 AM
|
显示全部楼层
本帖最后由 icy97 于 4-8-2021 07:29 AM 编辑
Type | Announcement | Subject | OTHERS | Description | SAPURA ENERGY BERHAD AWARD OF CONTRACTS | INTRODUCTION Sapura Energy Berhad (“Sapura Energy" or the “Company”) is pleased to announce that its wholly-owned subsidiaries in Engineering and Construction (E&C) and Drilling have been awarded several contracts with a combined value of approximately RM611 million. Details of each contract (“Contracts”) are as summarised below:
Engineering & Construction: Qatar AWARD OF CONTRACT FOR THE PROVISION OF ENGINEERING, PROCUREMENT, SUPPLY, CONSTRUCTION, INSTALLATION AND PRE-COMMISSIONING OF PIPELINES IN AL-KHALIJ FIELD FROM TOTAL E&P GOLFE LIMITED Sapura Fabrication Sdn Bhd - Qatar Branch has been awarded a contract for the provision of engineering, procurement, supply, construction, installation and pre-commissioning of 2 Nos 16” pipelines in Al-Khalij Field, Block 6 in Qatar by Total E&P Golfe Limited. The scope of work for this contract includes the engineering, procurement, supply, fabrication, construction, installation and pre-commissioning of 2 Nos 16” pipelines made of pipes lined with corrosion resistant alloy, between DP4 & DP3 and DP3 & DP2 platforms. The Al-Khalij field is located offshore Qatar approximately 110 km east of the mainland coast and approximately 40 km North East of Halul Island. The average water depth in the field is 59 m. The works are expected to be completed by Q2 FY2022.
Malaysia - Thailand AWARD OF CONTRACT FOR THE PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION, TRANSPORTATION & INSTALLATION AND HOOK-UP & COMMISSIONING FOR ADDITIONAL ANDALAS PIPELINE PROJECT PHASE 4 DEVELOPMENT BY CARIGALI-PTTEPI OPERATING COMPANY SDN BHD Sapura Fabrication Sdn Bhd has received an award for the provision of engineering, procurement, construction, transportation and installation as well as hook up and commissioning of Host Tie-In And Brownfield Modification Work For Additional Andalas Pipeline Project For Phase 4 Development in the Malaysia-Thailand Joint Development Area (MTJDA) from Carigali-PTTEPI Operating Company Sdn Bhd. The contract scope of work comprises of engineering, procurement, onshore construction, transportation and marine spread chartering, as well as offshore hook up and commissioning of Host Tie-In and Brownfield Modification at Jengka-A Wellhead Platform, Andalas-B Wellhead Platform, and MUDA Central Processing Platforms. The works are expected to be completed by Q3 FY2022.
Drilling: Congo AWARD OF CONTRACT FOR TENDER ASSIST DRILLING RIG “SAPURA BERANI” BY TOTAL EXPLORATION & PRODUCTION CONGO. Sapura Drilling Holdings Limited, has been awarded a contract by Total Exploration and Production Congo for the provision of its Tender Assist Drilling Rig “Sapura Berani” services. The scope of the contract comprises the provision of semi tender-assist drilling rig services for 3 wells commencing in Q4 FY2021 for a period of 3 months offshore Congo plus one option of one well extension.
FINANCIAL EFFECTS The Contracts announced herein will have no effect on the issued capital of the Company and is expected to contribute positively towards the earnings of Sapura Energy Berhad and its subsidiaries (“the Group”) for the financial year ending 31 January 2021 and the financial period thereafter within the duration of the Contracts period.
RISK FACTORS Risk factors affecting the Contracts including execution risks such as availability of skilled manpower and materials, changes in pricing, weather conditions and/or political, economic, operational and commercial impacts of COVID-19 and regulatory conditions. Notwithstanding, the Group has established a successful track record undertaking similar projects.
DIRECTORS’ AND MAJOR SHAREHOLDERS’ INTERESTS None of the Directors and/or major shareholders of the Company and/or persons connected with them have any direct or indirect interest in the award of the Contracts herein.
DIRECTOR’S STATEMENT The Board is of the opinion that the acceptance of the Contracts is in the best interest of the Company.
This announcement is dated 16 November 2020. | https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3105157
Type | Announcement | Subject | OTHERS | Description | SAPURA ENERGY BERHAD - AWARD OF CONTRACTS | Further to our annuncement dated 16 November 2020 in relation to the award of contracts, we attach herewith the amended media release titled "Sapura Energy Secures Al-Khalij Pipeline Project Among RM611 Million New Contract Wins"
This announcement is dated 17 November 2020. | https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3105761
SUMMARY OF KEY FINANCIAL INFORMATION
31 Oct 2020 |
| INDIVIDUAL PERIOD | CUMULATIVE PERIOD | CURRENT YEAR QUARTER | PRECEDING YEAR
CORRESPONDING
QUARTER | CURRENT YEAR TO DATE | PRECEDING YEAR
CORRESPONDING
PERIOD | 31 Oct 2020 | 31 Oct 2019 | 31 Oct 2020 | 31 Oct 2019 | $$'000 | $$'000 | $$'000 | $$'000 |
1 | Revenue | 1,328,379 | 1,777,401 | 3,904,278 | 5,337,260 | 2 | Profit/(loss) before tax | 58,983 | -113,237 | 148,551 | -284,818 | 3 | Profit/(loss) for the period | 17,502 | -101,968 | 55,061 | -327,853 | 4 | Profit/(loss) attributable to ordinary equity holders of the parent | 17,205 | -100,891 | 55,156 | -326,299 | 5 | Basic earnings/(loss) per share (Subunit) | 0.11 | -0.63 | 0.35 | -2.05 | 6 | Proposed/Declared dividend per share (Subunit) | 0.00 | 0.00 | 0.00 | 0.00 |
|
| AS AT END OF CURRENT QUARTER | AS AT PRECEDING FINANCIAL YEAR END | 7
| Net assets per share attributable to ordinary equity holders of the parent ($$) | 0.5800 | 0.5700
|
|
|
|
|
|
|
|
|
发表于 27-2-2022 08:13 AM
|
显示全部楼层
Date of change | 01 Dec 2021 | Name | MR CHEW SENG HENG | Age | 55 | Gender | Male | Nationality | Malaysia | Type of change | Appointment | Designation | Chief Financial Officer | QualificationsNo | Qualifications | Major/Field of Study | Institute/University | Additional Information | 1 | Degree | Accounting | University of Malaya | | 2 | Professional Qualification | Chartered Accountant | Malaysia Institute of Accountants | |
| | Working experience and occupation | A senior finance professional with 30 years of broad experience in the energy sector working for Royal Dutch Shell Group. He started his career in 1991 with Shell companies in Malaysia and held the Finance Director position before moving to the Group head-office in 2013 based in The Hague for 7 years as the Head of Reporting. Prior to moving to The Hague, he held both country and regional roles responsible for Malaysia, Singapore, Brunei, the Philippines, Thailand, China, India, New Zealand and Australia. He joined Sapura Energy Berhad as Vice President, Group Controller in April 2021. He assumed the role of Acting Group Chief Financial Officer of Sapura Energy Berhad on 1 October 2021. | Directorships in public companies and listed issuers (if any) | Nil | Family relationship with any director and/or major shareholder of the listed issuer | Nil | Any conflict of interests that he/she has with the listed issuer | Nil | Details of any interest in the securities of the listed issuer or its subsidiaries | Sapura Energy BerhadDirect: 1,370 Ordinary Shares |
|
|
|
|
|
|
|
|
发表于 1-3-2022 08:32 AM
|
显示全部楼层
|
|
|
|
|
|
|
发表于 5-3-2022 09:24 AM
|
显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
31 Oct 2021 |
| INDIVIDUAL PERIOD | CUMULATIVE PERIOD | CURRENT YEAR QUARTER | PRECEDING YEAR
CORRESPONDING
QUARTER | CURRENT YEAR TO DATE | PRECEDING YEAR
CORRESPONDING
PERIOD | 31 Oct 2021 | 31 Oct 2020 | 31 Oct 2021 | 31 Oct 2020 | $$'000 | $$'000 | $$'000 | $$'000 |
1 | Revenue | 1,445,920 | 1,328,379 | 3,673,629 | 3,904,278 | 2 | Profit/(loss) before tax | -649,169 | 58,983 | -2,183,209 | 148,551 | 3 | Profit/(loss) for the period | -668,104 | 17,502 | -2,282,274 | 55,061 | 4 | Profit/(loss) attributable to ordinary equity holders of the parent | -669,342 | 17,205 | -2,283,307 | 55,156 | 5 | Basic earnings/(loss) per share (Subunit) | -4.19 | 0.11 | -14.30 | 0.35 | 6 | Proposed/Declared dividend per share (Subunit) | 0.00 | 0.00 | 0.00 | 0.00 |
|
| AS AT END OF CURRENT QUARTER | AS AT PRECEDING FINANCIAL YEAR END | 7
| Net assets per share attributable to ordinary equity holders of the parent ($$) | 0.4300 | 0.5600
|
|
|
|
|
|
|
|
|
发表于 6-9-2022 08:29 AM
|
显示全部楼层
Type | Announcement | Subject | OTHERS | Description | SAPURA ENERGY BERHADASSISTANCE TO MEDIATE BY THE CORPORATE DEBT RESTRUCTURING COMMITTEE OF BANK NEGARA MALAYSIA | The Board of Directors of Sapura Energy Berhad (“SEB”) wishes to announce that the Corporate Debt Restructuring Committee of Malaysia (“CDRC”), a committee under the purview of Bank Negara Malaysia (“BNM”), has on 1 September 2022 accepted SEB’s application for assistance to mediate in the debt restructuring negotiations with its MCF Financiers (“Lenders”), being certain financial institutions who have provided multicurrency facilities to Sapura TMC Sdn. Bhd., under: - the senior multicurrency term facilities agreement dated 29 March 2021 between, inter alia, Sapura TMC Sdn. Bhd. as borrower, and the banks named therein as conventional facility lenders; and/or
- the multicurrency sukuk programme of up to RM10 billion in nominal value based on the Shariah principle of murabahah (via a tawarruq arrangement), established under a programme agreement originally dated 20 August 2015 between Sapura TMC Sdn. Bhd. as issuer, Maybank Investment Bank Berhad as lead arranger, and Maybank Investment Bank Berhad as facility agent, and as thereafter amended and supplemented.
SEB and nine of its subsidiaries, who are obligors to the MCF Financiers, which are listed in the Appendix 1 (“Admitted Group Companies”), were admitted with effect from that date.
Following the CDRC’s acceptance of SEB’s application, CDRC has issued a letter addressed to: - SEB and its Lenders whereby the Lenders are expected to observe an informal standstill and withhold from any proceedings and SEB is expected to submit a proposal for a restructuring of its debts within 60 days from 1 September 2022; and
- SEB where SEB and the Admitted Group Companies are required to adhere to and be bound by Bank Negara Malaysia CDRC Participant’s Code of Conduct (“Code”) and any variations thereof as determined at the discretion of the CDRC from time to time.
The operations of the SEB Group shall continue as usual in the interim.
Further announcements will be made as and when appropriate.
This announcement is dated 5 September 2022. | https://www.bursamalaysia.com/market_information/announcements/company_announcement/announcement_details?ann_id=3289832
|
|
|
|
|
|
|
|
发表于 12-9-2022 10:34 AM
|
显示全部楼层
|
|
|
|
|
|
|
发表于 27-9-2022 11:46 AM
|
显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
31 Jul 2022 |
| INDIVIDUAL PERIOD | CUMULATIVE PERIOD | CURRENT YEAR QUARTER | PRECEDING YEAR
CORRESPONDING
QUARTER | CURRENT YEAR TO DATE | PRECEDING YEAR
CORRESPONDING
PERIOD | 31 Jul 2022 | 31 Jul 2021 | 31 Jul 2022 | 31 Jul 2021 | $$'000 | $$'000 | $$'000 | $$'000 |
1 | Revenue | 1,172,878 | 747,115 | 2,058,959 | 2,217,709 | 2 | Profit/(loss) before tax | 25,188 | -1,470,030 | 121,990 | -1,534,040 | 3 | Profit/(loss) for the period | -1,736 | -1,511,968 | 85,656 | -1,614,170 | 4 | Profit/(loss) attributable to ordinary equity holders of the parent | -2,592 | -1,516,891 | 89,342 | -1,613,965 | 5 | Basic earnings/(loss) per share (Subunit) | -0.02 | -9.50 | 0.56 | -10.11 | 6 | Proposed/Declared dividend per share (Subunit) | 0.00 | 0.00 | 0.00 | 0.00 |
|
| AS AT END OF CURRENT QUARTER | AS AT PRECEDING FINANCIAL YEAR END | 7
| Net assets per share attributable to ordinary equity holders of the parent ($$) | 0.0100 | 0.0100
|
|
|
|
|
|
|
|
| |