|
查看: 2717|回复: 7
|
SAAG有好消息吗?
[复制链接]
|
|
|
SAAG CONSOLIDATED (M) BHD ("SAAG" or "the Company")
(I) Proposed renounceable two (2) call rights issue of up to 5,200,549,005 new
ordinary shares of RM0.10 each in SAAG ("Rights Share(s)") on the basis of five
(5) Rights Shares for every two (2) existing ordinary shares of RM0.10 each
held in SAAG ("SAAG Share(s)") together with up to 1,040,109,801 free
detachable warrants ("Warrant(s)") on the basis of one (1) Warrant for every
five (5) Rights Shares subscribed ("Proposed Rights Issue");
(II) Proposed issuance of up to such amount of United States Dollar ("USD")
(not exceeding the Differential Intended Gross Proceeds as defined below)
nominal value five (5)-year unsecured guaranteed exchangeable bonds by SAAG (L)
Limited ("SAAGL"), a wholly-owned subsidiary of the Company ("Exchangeable
Bonds") which are exchangeable into new SAAG Shares ("Proposed Exchangeable
Bonds"); and / or
(III) Proposed issuance of up to such amount of Ringgit Malaysia ("RM") (not
exceeding the Differential Intended Gross Proceeds) nominal value of five
(5)-year irredeemable convertible preference shares of RM0.10 each in SAAG
("ICPS") which are convertible into new SAAG Shares ("Proposed ICPS Issue");
(IV) Proposed establishment of an Employees Share Option Scheme ("ESOS") of up
to fifteen per centum (15%) of the issued and paid-up share capital of SAAG at
anytime for the Directors (including Non-Executive Directors) of SAAG and
eligible employees of SAAG and its subsidiaries ("SAAG Group" or "Group")
("Proposed ESOS" or "Scheme"); and
(V) Proposed amendments to the Memorandum and Articles of Association of SAAG
("Memorandum and Articles") ("Proposed Amendments"); |
|
|
|
|
|
|
|
|
|
|
发表于 14-12-2010 07:28 PM
|
显示全部楼层
发付加股算是好消息吗? |
|
|
|
|
|
|
|
|
|
|
发表于 14-12-2010 10:29 PM
|
显示全部楼层
为什么股价会酱低呢?
Monday, 29 Nov 2010
6:29PM Nine-month net profit 20.417 million (increased 8815.72%) |
|
|
|
|
|
|
|
|
|
|
发表于 10-1-2011 01:57 PM
|
显示全部楼层
KUALA LUMPUR: SAAG CONSOLIDATED (M) BHD []'s subsidiary has secured a US$78 million (RM239.54 million) contract from Mrails Tram (Melaka) Sdn Bhd to design and build 40 km of tramway in Melaka.
SAAG said on Monday, Jan 10 its overseas subsidiary OGS Asiapac Ltd had secured the design, engineering, procurement, CONSTRUCTION [] and commissioning (EPCC) contract on Dec 23 last year.
Mrails Tram is incorporated in Malaysia and it had signed a principal agreement with the Chief Minister of Malacca (Incorporation) on March 3 last year for a 25 year concession with the Malacca government to provide 40 km of tramway in the state capital to enhance the public transport facilities.
还不追吗。。。。。来咯。。。。。 |
|
|
|
|
|
|
|
|
|
|
发表于 10-1-2011 02:24 PM
|
显示全部楼层
|
|
|
|
|
|
|
|
|
|
发表于 10-1-2011 02:25 PM
|
显示全部楼层
|
|
|
|
|
|
|
|
|
|
发表于 11-1-2011 08:23 AM
|
显示全部楼层
|
|
|
|
|
|
|
|
|
|
发表于 11-1-2011 11:15 PM
|
显示全部楼层
看到很多人还在排队。。。
难道真的来了?  |
|
|
|
|
|
|
|
|
| |
本周最热论坛帖子
|